BLD-Final | 12/30/2014 | 12/31/2014 | 12/31/2014 | A | PASS |
Jim Sly
|
|
|
Colyn Phone #: ###-#### OK for perm occ.
|
BLD-Final | 11/28/2014 | 12/1/2014 | 12/1/2014 | A | NR |
Jim Sly
|
|
|
###-#### Need Public Works and Zoning Approval.
|
BLD-Final | 11/28/2014 | 11/28/2014 | 11/28/2014 | A | CANC |
Jim Sly
|
|
|
###-#### Re-scheduled.
|
FIRE-Final Inspection | 11/25/2014 | 11/26/2014 | 11/26/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 11/24/2014 | 11/25/2014 | 11/25/2014 | A | FAIL |
Troy Cobbley
|
|
|
Per Craig Hansen the fire dept access will be addressed at a later date when the two additional green houses are built. Also per Craig a knox box will not be required. Per John Menard door hardware to the mechanical areas is ok. Had to fail since the exit sign still does not work.
|
FIRE-Final Inspection | 11/17/2014 | 11/18/2014 | 11/18/2014 | A | FAIL |
Troy Cobbley
|
|
|
Provide paved fire dept access per plans and notes, provide knox box per plans, provide single action hardware on the mechanical chase doors.
|
BLD-Wall Bracing | 9/26/2014 | 9/29/2014 | 9/29/2014 | A | PART |
Jim Sly
|
|
|
Golyn Phone #: ###-#### all interior sheet metal shear screwing ....ok.
|
BLD-Wall cover | 9/9/2014 | 9/10/2014 | 9/10/2014 | A | PART |
Jim Sly
|
|
|
Colyn Phone #: ###-#### Exterior OSB fastening OK including Ext shear panels. Interior metal shear wall fasteningl at S. end of potato storage .......OK.
|
BLD-Framing/Rough-in | 8/29/2014 | 8/29/2014 | 8/29/2014 | P | PART |
Jim Sly
|
|
|
Colyn Phone #: ###-#### checked HDs, truss conn, welding, shear.......partial only.....call for framing insp when ready.
|
BLD-Other | 7/23/2014 | 7/24/2014 | 7/24/2014 | A | PART |
Jim Sly
|
|
|
rebar // Colen Phone #: ###-#### Stem Walls OK pending MTI special insp, tests and approvals.
|
BLD-Other | 7/18/2014 | 7/21/2014 | 7/21/2014 | P | PART |
Mike Jordan
|
|
|
rebar // Colyn Phone #: ###-####. Will hace special inspection. work in progress on central portion of footing.
|