BLD-Final | 1/20/2015 | 1/21/2015 | 1/21/2015 | A | PASS |
Dave Hannah
|
|
|
Darren// please call 30 min prior to unlock bldg Phone #: ###-####
|
DOC - Permit Finaled | 1/21/2015 | 1/21/2015 | 1/21/2015 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Forrest France
|
|
|
Previous correction items verified for completion. Vanilla shell fire life safety passed.
|
FIRE-Final Inspection | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | FAIL |
Forrest France
|
|
|
Modifications to the existing fire sprinkler system will be required due to remodel work. Removal of the drop ceilings and interior walls has disrupted sprinkler coverage, head listings, response time index. Refer to scope of work for conditions regarding alterations to fire sprinkler systems.
|
BLD-Final | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | CANC |
Dave Hannah
|
|
|
Darren Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|
FIRE-Final Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | CANC |
Forrest France
|
|
|
Daryn Phone #: ###-#### Inspection cancelled from web by: Barbara Stitt
|