BLD-Final | 7/8/2014 | 7/10/2014 | 7/10/2014 | A | PASS |
Jim Sly
|
|
|
Chad Phone #: ###-####
|
DOC - Permit Finaled | 7/10/2014 | 7/10/2014 | 7/10/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 6/10/2014 | 6/10/2014 | 6/10/2014 | P | PASS |
Jim Sly
|
|
|
chad Phone #: ###-####
|
BLD-Framing/Rough-in | 6/10/2014 | 6/10/2014 | 6/10/2014 | P | PASS |
Jim Sly
|
|
|
chad Phone #: ###-####
|
BLD-Energy code compliance | 6/4/2014 | 6/9/2014 | 6/9/2014 | A | CANC |
Jim Sly
|
|
|
Chad Phone #: ###-####
|
BLD-Framing/Rough-in | 6/4/2014 | 6/5/2014 | 6/5/2014 | A | FAIL |
Mike Jordan
|
|
|
chad - call for access Phone #: ###-####. Provide tempered glazing at windows by front door, install lateral bracing on new trusses as per truss engineering, provide 2 layers of 5/8type x rock behind shower/tub stall and in attic. ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 5/29/2014 | 5/30/2014 | 5/30/2014 | A | PASS |
Jim Sly
|
|
|
Chad Phone #: ###-####
|