BLD-Final | 7/1/2014 | 7/2/2014 | 7/2/2014 | A | PASS |
Jim Sly
|
|
|
Passed Per Forrest France. Forrest signed for Structural.
|
FIRE-Final Inspection | 7/1/2014 | 7/2/2014 | 7/2/2014 | A | PASS |
Forrest France
|
|
|
Verified previous correction items for completion. Door hardware okayed per plan review notes and structural inspector.
|
FIRE-Final Inspection | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | FAIL |
Forrest France
|
|
|
Provide illuminated exit signs at locations per plan red-lines, repair existing EM lighting at the office area and provide EM lighting at service bays, post "door to remain..." signage at the main entry/exit, provide approved hardware at all exit doors.
|
BLD-Final | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | FAIL |
Jim Storey
|
|
|
Chris-call 10 minutes prior to meet Phone #: ###-#### need ratting and door protection of firewall/ no rock on 2 nd floor
|