BLD-Final | 8/21/2014 | 8/22/2014 | 8/22/2014 | A | PASS |
Mike Jordan
|
|
|
Curt Phone #: ###-####
|
DOC - Permit Finaled | 8/22/2014 | 8/22/2014 | 8/22/2014 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 8/21/2014 | 8/22/2014 | 8/22/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/19/2014 | 8/21/2014 | 8/21/2014 | P | NR |
Mike Jordan
|
|
|
Curt Phone #: ###-####. Needs fire/life/safety final.
|
BLD-Ceiling Grid Inspection | 8/4/2014 | 8/5/2014 | 8/6/2014 | P | PASS |
Jim Sly
|
|
|
Curt Phone #: ###-####-please call prior to meet
|
BLD-Framing/Rough-in | 7/24/2014 | 7/25/2014 | 7/25/2014 | P | PART |
Mike Jordan
|
|
|
Kirk Phone #: ###-####. Interior steel stud walls for new prep area. Pending electrical rough in inspection. Also instal required straping in walls or provide RFI deleting the strAPS.
|
BLD-Framing/Rough-in | 7/17/2014 | 7/18/2014 | 7/18/2014 | P | PASS |
Mike Jordan
|
|
|
Please call ahead of time so he can meet you there--Ceiling grid inspection please-Kurt Phone #: ###-####. ceiling grid in pharmacy only ok.
|
BLD-Framing/Rough-in | 7/9/2014 | 7/10/2014 | 7/10/2014 | P | PASS |
Mike Jordan
|
|
|
Kurt-Please call prior to inspection Phone #: ###-####. Interior steel stud walls at pharmacy ok. no grid.
|