BLD-Final | 1/13/2015 | 1/13/2015 | 1/13/2015 | P | PASS |
Jim Storey
|
|
|
An-had part final pending plm. plm was done today Phone #: ###-####
|
BLD-Aging Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | | DEFR |
Jim Storey
|
|
|
plm
|
BLD-Aging Inspection | 11/10/2014 | 11/10/2014 | 11/10/2014 | | DEFR |
Jim Storey
|
|
|
pending plumbing
|
FIRE-Final Inspection | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Final | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | PART |
Jim Storey
|
|
|
An Phone #: ###-#### need plm final
|
FIRE-Final Inspection | 9/8/2014 | 9/8/2014 | 9/8/2014 | A | PASS |
Forrest France
|
|
|
Verified correction items are finished. Fire life safety passed.
|
BLD-Final | 9/5/2014 | 9/5/2014 | 9/8/2014 | P | NR |
Jim Storey
|
|
|
An-please call prior to meet Phone #: ###-####
|
FIRE-Final Inspection | 9/5/2014 | 9/5/2014 | 9/5/2014 | P | FAIL |
Forrest France
|
|
|
Correction items include; repair EM light/exit sign at the east exit, provide approved style hardware at both restroom doors, post fire extinguisher per plan note #19.
|