BLD-Final | 7/15/2014 | 7/15/2014 | 7/15/2014 | P | PASS |
Dave Hannah
|
|
|
Magaret Phone #: ###-####
|
BLD-Final | 7/7/2014 | 7/15/2014 | 7/15/2014 | A | NR |
Dave Hannah
|
|
|
###-#### Margaret
|
BLD-Final | 6/16/2014 | 6/17/2014 | 6/17/2014 | A | FAIL |
Jim Storey
|
|
|
Margaret Phone #: ###-#### exit hardware and signage/ handrails and saftey glazing at elavated stre front/ floor load signage.
|
FIRE-Conference | 6/16/2014 | 6/16/2014 | 6/16/2014 | P | DONE |
Forrest France
|
|
|
Regarding life safety items, trade related inspections, and conditions for occupancy.
|
FIRE-Final Inspection | 6/12/2014 | 6/16/2014 | 6/16/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety passed provided approved door hardware is installed at the main entry/exit as discussed prior to structural final.
|