BLD-Final | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | PASS |
Jim Sly
|
|
|
OK for Perm Occ. N/A Mechanical.
|
BLD-Conference | 9/11/2014 | 9/12/2014 | 9/12/2014 | P | DONE |
Jim Sly
|
|
|
Final Inspection
Thanks Dave Phone #: ###-#### Inspection requested via web by David Moorhouse
|
FIRE-Final Inspection | 9/10/2014 | 9/11/2014 | 9/11/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection completed satisfactory. *Note- provide approved style hardware at the two new pocket doors prior to structural final.
|
BLD-Final | 9/10/2014 | 9/11/2014 | 9/11/2014 | P | CANC |
Jim Sly
|
|
|
Final inspection - Do not have an inspection card?
Thanks,
Dave Phone #: ###-#### >> Inspection requested via web by David Moorhouse Inspection cancelled from web by: David Moorhouse
|
BLD-Ceiling Grid Inspection | 9/5/2014 | 9/8/2014 | 9/8/2014 | A | PASS |
Mike Jordan
|
|
|
We will be ready for ceiling grid inspection Monday AM. Thank you,
Dave Moorhouse Phone #: ###-#### Inspection requested via web by David Moorhouse
|
BLD-Conference | 8/5/2014 | 8/6/2014 | 8/6/2014 | A | PASS |
Jim Sly
|
|
|
Inspection to approve for cover. Phone #: ###-#### Inspection requested via web by David Moorhouse OK to Cover.
|