Permit Information
Permit NumberBLD14-01798
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 350 N MILWAUKEE ST Unit: 2101
Project NameBTS - #2101 FOOT LOCKER
Customer Number 
ePlanReviewNo
Description
(FOOT LOCKER – BTS SPACE # 1170) Permit is to remodel an existing 3,019 square foot retail tenant space with in a covered mall building. This tenant space was last remodeled under BLD10-00516 for “Foot Locker”. Scope of work includes: new mechanical system, new suspended ceiling, new accessible counter, minor changes to existing partition walls, new lighting, new accessible doors / hardware, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. NOTE: a separate sign permit for interior mall signage is required before sign installation. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/14/201410/14/201410/14/2014PPASS
DetailsMike Jordan
Rocco Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection10/13/201410/14/201410/14/2014APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection10/13/201410/13/201410/13/2014PFAIL
DetailsTroy Cobbley
Need Exit signs installed as per the city approved drawings. Smoke evac tested ok.
BLD-Ceiling Grid Inspection10/2/201410/2/201410/2/2014PPART
DetailsMike Jordan
Rocco Phone #: ###-####. Pend. elec. and mech. rough in inspections.
BLD-Framing/Rough-in9/22/20149/23/20149/23/2014APASS
DetailsMike Jordan
Rocco Phone #: ###-####. interior steel stud walls, no grid.
BLD-Framing/Rough-in9/19/20149/22/20149/22/2014ANR
DetailsMike Jordan
Rocco Phone #: ###-####. Needs electrical rough in inspection first.