Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD14-01822
StatusFinaled
Name ESI
Site Address 513 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer NumberBLD14-01818 FOR DRAWNGS
ePlanReviewYes
Description
(THE DISTRICT AT PARKCENTER - COTTAGE BUILDING B - #1) (2-1-15 PLAN MODIFICATION TO RE-DESIGN THE STRUCTURAL SYSTEM FROM THE FOUNDATION UP. REVISED STRUCTURAL DRAWINGS ARE FILED UNDER BLD14-01822 IN EPLANREVIEW.) (The drawings are filed under permit BLD14-01818 in ePlanReview) To construct a 10 dwelling unit two story apartment building with six units having their own garage (i.e. 6 garages). Four dwelling units will not have garages. The total floor area of this building is about 12,497 square feet (8,089 square feet 1st story and 4,408 square feet 2nd story). All ground floor units within Cottage Building B - #1 and Cottage Building B - #2 are required to comply as Type B dwelling units. Two ground floor units within Cottage Building A - #2 are required to comply as Type A dwelling units. Work is to include interior nonbearing walls, 1-hr bearing walls, 1-hr roof-ceiling assemblies, 1-hr floor-ceiling assemblies, 1-hr dwelling unit separations, attic insulation, interior doors, exterior windows and doors, insulated exterior walls, “Hardi-board” exterior siding, exterior manufactured stone wainscot, composition roof shingles, common stairways within a 1-hr corridor open to the outside, private interior stairways, garages, garage overhead doors, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, wood floor trusses, wood roof trusses, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. The designs for the roof trusses and floor trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/27/20171/30/20171/30/2017PPASS
DetailsJim Storey
cory Phone #: ###-####
FIRE-Final Inspection1/30/20171/30/20171/30/2017APASS
DetailsJim Page
Final life fire safety inspection passed/complete
BLD-Aging Inspection12/27/201612/27/201612/27/2016 DONE
DetailsJim Storey
BLD-Final10/25/201610/28/201610/28/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Final Inspection10/27/201610/28/201610/28/2016APART
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current insepction tags. Partial final for life fire safety complete, permit will stay in issued status until clubhouse FIR permit is complete, all remote fire panels report to clubhouse panel. After clubhouse FIR permit is finalized then this permit can be finalized.
FIRE-Final Inspection10/25/201610/27/201610/27/2016PCANC
DetailsJim Page
Inspection request rescheduled for 28OCT2016 per conversation with Corey, Phone #: ###-####.
FIRE-Supply Line Hydro10/27/201610/27/201610/27/2016ACANC
DetailsJim Page
Corey ###-####
BLD-Other8/24/20168/25/20168/25/2016APASS
DetailsJim Storey
Bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other8/23/20168/24/20168/24/2016APART
DetailsJim Storey
Bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith c/n posted
BLD-Final7/28/20167/28/20167/28/2016PDONE
DetailsJim Storey
BLD-Framing/Rough-in7/26/20167/27/20167/27/2016PNR
DetailsJim Storey
re inspect Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/22/20167/26/20167/26/2016APART
DetailsJim Storey
Framing rough in Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing6/28/20166/28/20166/28/2016PPASS
DetailsJim Storey
Roof and wall sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith