Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD14-01826
StatusFinaled
Name ESI
Site Address 537 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer NumberBLD14-01818 FOR DRAWNGS
ePlanReviewYes
Description
(THE DISTRICT AT PARKCENTER - INTOWN BUILDING A - #1) (The drawings are filed under permit BLD14-01818 in ePlanReview) (11-23-15 PLAN MODIFICATION TO RE-DESIGN THE STRUCTURAL SYSTEM FROM THE FOUNDATION UP. REVISED STRUCTURAL DRAWINGS ARE FILED UNDER BLD14-01826 IN EPLANREVIEW.) (8-25-15 PLAN MODIFICATION TO PROVIDE EXTERIOR EXPANDED POLYSTYRENE FOUNDATION INSULATION IN COMPLIANCE WITH SHALLOW FOUNDATION STANDARDS AT LOCATIONS WHERE THE BOTTOM OF THE FOOTINGS WILL BE LESS THAN 24 INCHES BELOW FINISHED GRADE. THE INTENT IS TO PREVENT FROST HEAVE.) Fire sprinkler system used for R-2 Occupancy. To construct a three story apartment building having a total of 76 dwelling units (24 units 1st story, 26 units 2nd story, and 26 units 3rd story). The 1st story will have a 1,630 square foot storage area with 21 storage units. The interior court on the 1st story will be used for assembly purposes with the egress system passing through the building and sharing the egress system that serves the 1st story apartments. The 1-hr corridors will be enclosed and conditioned and the 1-hr exterior stairways on all stories will be open to the outside. The total floor area of this building is about 81,567 square feet (about 27,189 square feet each story). For building area reasons, this building is divided by a 2-hr fire wall, each side having about 13,550 square feet per story. All ground floor units are required to comply as Type B dwelling units. Two of those ground floor units are required to comply as Type A dwelling units. Because this building does not have an elevator, none of the units located on the 2nd and 3rd stories are regulated for accessibility to the disabled. Work is to include 2-hr fire walls, interior nonbearing walls, 1-hr bearing walls, 1-hr roof-ceiling assemblies, 1-hr floor-ceiling assemblies, 1-hr dwelling unit separations (fire partitions and horizontal assemblies), attic insulation, interior doors, exterior windows and doors, insulated exterior walls, “Hardi-board” exterior siding, exterior manufactured stone wainscot, composition roof shingles, membrane roof coverings for flat roofs, 1-hr common corridors, 1-hr common exterior stairways, draftstops in floors and attics, millwork, and finishes. Structural work includes concrete footings, concrete stem walls, concrete floor slabs on grade with thickened footings at interior bearing walls, wood floor trusses, wood roof trusses, wood columns, wood beams, and shear walls. Special inspection is required for soils, concrete, and wood. The designs for the roof trusses and floor trusses are deferred submittal items. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/27/20171/30/20171/30/2017PPASS
DetailsJim Storey
cory Phone #: ###-####
BLD-Final1/24/20171/27/20171/27/2017APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Corey Hockersmith
FIRE-Final Inspection1/24/20171/25/20171/25/2017APASS
DetailsKatie Marron
FIre Life Safety Pass.
BLD-Wall Bracing12/23/201612/27/201612/27/2016APASS
DetailsJim Storey
Inspect west corridor sheer first and second floor. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing12/21/201612/23/201612/23/2016PDEFR
DetailsJim Storey
Inspect west corridor sheer first and second floor. Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other9/27/20169/27/20169/27/2016APASS
DetailsJim Storey
First floor bathroom ceiling inspections Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other9/26/20169/26/20169/26/2016PFAIL
DetailsJim Storey
First floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other9/12/20169/13/20169/13/2016APASS
DetailsJim Storey
Second floor bathroom ceiling drops Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Other8/31/20169/2/20169/2/2016APASS
DetailsJim Storey
Third floor bathroom ceilings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection8/17/20168/18/20168/18/2016PPASS
DetailsJim Storey
First Floor RC Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection8/15/20168/16/20168/16/2016APASS
DetailsJim Storey
Second floor RC Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Ceiling Grid Inspection8/15/20168/15/20168/15/2016PPART
DetailsJim Storey
Second floor RC Phone #: ###-#### Inspection requested via web by Corey Hockersmith missing 217 and service rms
BLD-Ceiling Grid Inspection8/9/20168/9/20168/9/2016PPASS
DetailsJim Storey
Third floor RC inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in8/4/20168/5/20168/5/2016APASS
DetailsJim Storey
First floor framing inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in8/2/20168/2/20168/2/2016APASS
DetailsJim Storey
Second floor framing rough in Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/28/20167/29/20167/29/2016APASS
DetailsPhil Shearer
Third floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Framing/Rough-in7/27/20167/27/20167/27/2016PPART
DetailsJim Storey
Third floor framing Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing5/9/20165/10/20165/10/2016APASS
DetailsJim Storey
Fire rated plywood on roof Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Wall Bracing5/6/20165/9/20165/9/2016APASS
DetailsJim Storey
Roof sheer inspection Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Conference10/23/201510/23/201510/23/2015APASS
DetailsJim Storey
BLD-Foundation7/22/20157/23/20157/23/2015APASS
DetailsJim Storey
Concrete to be on site at 1:30 Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Foundation7/20/20157/21/20157/21/2015APASS
DetailsJim Storey
Concrete to be onsite at 1:30pm Phone #: ###-#### Inspection requested via web by Corey Hockersmith placed w/si
BLD-Footing7/16/20157/17/20157/17/2015APART
DetailsJim Storey
Monday pour at 8am Phone #: ###-#### Inspection requested via web by Corey Hockersmith si pending
BLD-Foundation7/14/20157/15/20157/15/2015APART
DetailsJim Storey
Courtyard stem wall Phone #: ###-#### Inspection requested via web by Corey Hockersmith placed w/si
BLD-Footing7/13/20157/14/20157/14/2015APASS
DetailsJim Storey
courtyard stem wall and half of exterior footings Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD-Footing7/9/20157/13/20157/13/2015APASS
DetailsJim Storey
20 yard pour at 1:00pm Phone #: ###-#### Inspection requested via web by Corey Hockersmith interior ft ok pending si report