BLD-Final | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PASS |
Phil Shearer
|
|
|
Clark Phone #: ###-####
|
DOC - Permit Finaled | 4/24/2015 | 4/24/2015 | 4/24/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | FAIL |
Phil Shearer
|
|
|
Clark-please call 15 minutes prior Phone #: ###-####. handrall needs to extend to the top of the stairs bottom step need to be 7 3/4" max CN posted
|
BLD-Energy code compliance | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | PASS |
Mike Jordan
|
|
|
Clark Phone #: ###-####
|
BLD-Framing/Rough-in | 10/2/2014 | 10/6/2014 | 10/6/2014 | A | PASS |
Phil Shearer
|
|
|
Clark// please call before Phone #: ###-####
|
BLD-Framing/Rough-in | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | FAIL |
Phil Shearer
|
|
|
CN posted
|
BLD-Wall Bracing | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | PASS |
Phil Shearer
|
|
|
Clark Phone #: ###-####
|
BLD-Footing | 9/17/2014 | 9/17/2014 | 9/17/2014 | P | PASS |
Phil Shearer
|
|
|
Clark Phone #: ###-#### Basement collumn footing
|
BLD-Footing | 7/17/2014 | 7/17/2014 | 7/17/2014 | P | CANC |
Mike Jordan
|
|
|
PLease call at least 30 mins prior so he can meet ya there--Stem wall inspection please-Mike Cook Phone #: ###-####
|
BLD-Foundation | 7/17/2014 | 7/17/2014 | 7/17/2014 | P | PASS |
Mike Jordan
|
|
|
PLease call at least 30 mins prior so he can meet ya there--Stem wall inspection please-Mike Cook Phone #: ###-####
|
BLD-Footing | 7/14/2014 | 7/15/2014 | 7/15/2014 | A | PART |
Mike Jordan
|
|
|
Late morning please - Mike Phone #: ###-####
|