BLD-Final | 8/14/2017 | 8/15/2017 | 8/15/2017 | A | PASS |
Jim Storey
|
|
|
Joe-call lock box code Phone #: ###-####
|
DOC - Permit Finaled | 8/15/2017 | 8/15/2017 | 8/15/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 7/24/2017 | 7/25/2017 | 7/25/2017 | P | NR |
Jim Storey
|
|
|
Call 30 minutes before to meet // Joe Phone #: ###-####need mech sign off
|
BLD-Aging Inspection | 10/6/2016 | 10/6/2016 | 10/10/2016 | | NR |
Jim Storey
|
|
|
open trade permits
|
BLD-Aging Inspection | 10/5/2016 | 10/5/2016 | 10/10/2016 | | NR |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 5/24/2016 | 5/24/2016 | 5/24/2016 | P | PASS |
Jim Storey
|
|
|
Call 20 mintues before to be let in // Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | CANC |
Jim Storey
|
|
|
Cancel Per Mike with Levco // would like early as possible; Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 5/18/2016 | 5/18/2016 | 5/18/2016 | P | FAIL |
Jim Storey
|
|
|
Call 15 before // Mike Phone #: ###-####
|
BLD-Energy code compliance | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | NR |
Jim Storey
|
|
|
Mike// please call before Phone #: ###-####
|
BLD-Framing/Rough-in | 5/16/2016 | 5/17/2016 | 5/17/2016 | A | FAIL |
Jim Storey
|
|
|
Mike Phone #: ###-####// please call beforeneed hvac/ stair fire blk/ header east gable/ ceilling fire blk
|
BLD-Framing/Rough-in | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | PART |
Jim Storey
|
|
|
Steve Phone #: ###-#### conf ok
|
BLD-Conference | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | PASS |
Jim Storey
|
|
|
Steve Phone #: ###-####
|
BLD-Footing | 7/21/2014 | 7/21/2014 | 7/21/2014 | P | PASS |
Jim Storey
|
|
|
Tony Phone #: ###-####
|