FIRE-Final Inspection | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Troy Cobbley
|
|
|
Previous corrections addressed. Life safety passed.
|
FIRE-Final Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 | A | NR |
Forrest France
|
|
|
Pending correction items per activity notes.
|
BLD-Final | 9/4/2014 | 9/8/2014 | 9/8/2014 | P | PASS |
Jim Storey
|
|
|
Devin Phone #: ###-#### pending fire sign off
|
FIRE-Final Inspection | 9/4/2014 | 9/8/2014 | 9/8/2014 | A | FAIL |
Forrest France
|
|
|
C/N items include; post two fire extinguishers at locations indicated on site, install exit signs and EM lighting at the back warehouse exits per plan review comments.
|