BLD-Final | 10/9/2014 | 10/10/2014 | 10/10/2014 | A | PASS |
Dave Hannah
|
|
|
Lock box is on door please call for code. Thank you Sean. Phone #: ###-#### Inspection requested via web by Sean Keefe ok for perm occ
|
BLD-Final | 10/8/2014 | 10/9/2014 | 10/9/2014 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Sean Keefe ok for temp occ needs to fix sec door harwear
|
FIRE-Final Inspection | 10/8/2014 | 10/8/2014 | 10/8/2014 | P | PASS |
Forrest France
|
|
|
C/n items finished with the exception of door hardware per plan at the second exit. This item to be completed prior to structural final and verified at that time per discussion. Fire life safety finaled.
|
FIRE-Final Inspection | 10/6/2014 | 10/7/2014 | 10/7/2014 | A | FAIL |
Forrest France
|
|
|
Refer to plan review annotations on stamped plan set sheets A1.1 and A2.1 for details regarding door hardware and exit signage to be provided prior to final. Remainder of fire life safety items okayed.
|
BLD-Ceiling Grid Inspection | 10/1/2014 | 10/1/2014 | 10/1/2014 | A | PASS |
Dave Hannah
|
|
|
Please call for lock box code if unattended. Thank you Sean Phone #: ###-#### Inspection requested via web by Sean Keefe
|
BLD-Framing/Rough-in | 9/10/2014 | 9/11/2014 | 9/11/2014 | A | PEND |
Dave Hannah
|
|
|
Lock box on door. Please call for code if I am not there. Thank you, Sean Phone #: ###-#### Inspection requested via web by Sean Keefe ok to cover after elec rough in is complted
|