Permit Information
Permit NumberBLD14-02773
StatusFinaled
Name CSDI CONSTRUCTION INC
Site Address 3201 W AIRPORT WAY
Project NameBig City Coffee
Customer Number 
ePlanReviewYes
Description
(BIG CITY COFFEE - CITY OF BOISE AIR TERMINAL - 2ND STORY - CONCOURSE B EXTENSION) Fire sprinklers used for building area increase and for fire area. To remodel an existing 845 square foot dining and food service tenant space for a new tenant (398 square feet customer seating, 281 square feet back bar, and 147 square feet kitchen). Work is to include a new customer service counter, a double leaf door with double-acting hinges to serve the kitchen, a hand sink, a wall mounted counter for dining, millwork, interior finishes, and equipment. No work is proposed within the existing kitchen. The existing coiling security grill will be maintained. An existing ceiling soffit will be removed and the gypsum board ceiling will be patched. False wood beams will be installed below the gypsum board ceiling. A new roof top HVAC unit will be installed to serve this tenant space in conjunction with this permit. Steel channels will be provided on top of the roof deck to transfer the load to 3 roof trusses. Special Inspection is required for welding. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/19/20152/20/20152/20/2015APASS
DetailsJim Storey
Jeffrey Phone #: ###-####
BLD-Final2/18/20152/19/20152/19/2015ANR
DetailsJim Storey
Jeffrey Phone #: ###-####
FIRE-Final Inspection2/18/20152/18/20152/18/2015PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Aging Inspection2/16/20152/16/20152/17/2015 NR
DetailsJim Storey
BLD-Final12/16/201412/17/201412/17/2014PPART
DetailsJim Storey
Mike Phone #: ###-#### temp ok
FIRE-Final Inspection12/15/201412/16/201412/16/2014APART
DetailsForrest France
Final pending project related fire alarm work to connect a duct smoke detector at an RTU not yet installed. ok for temp c of o
FIRE-Conference12/11/201412/12/201412/12/2014PDONE
DetailsForrest France
On site conference regarding project related fire alarm work, completion schedule, etc.
BLD-Conference12/11/201412/12/201412/12/2014PPASS
DetailsJim Storey
Jeffrey Phone #: ###-####