Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD14-02793
StatusFinaled
Name SYRINGA CONSTRUCTION LLC
Site Address 1219 E WASHINGTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2765 sq. ft., two story (first story 1683 sq. ft., second story 1082 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 374 sq. ft. of covered patio’s/porches and 575 sq. ft. detached garage (with storage above garage @ 418 sq. ft. for a total of 993 sq.ft. for detached garage) per the approved plans, plan review report and any notations. R-2H zoning and setbacks per planning.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/18/20155/19/20155/19/2015APASS
DetailsDave Hannah
Steve Phone #: ###-####// please call before
DOC - Permit Finaled5/19/20155/19/20155/19/2015PPASS
DetailsDave Hannah
BLD-Wall cover3/3/20153/3/20153/4/2015PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Lucas Christian
BLD-Wall cover2/20/20152/20/20152/20/2015PPART
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Lucas Christian
OK to rock house.........DO NOT COVER GARAGE until approved resubmittals are provided.
BLD-Framing/Rough-in2/17/20152/17/20152/17/2015APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Lucas Christian c/n on site ok to insulate
BLD-Wall Bracing2/9/20152/10/20152/10/2015APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Lucas Christian
BLD-Wall Bracing2/4/20152/4/20152/4/2015PFAIL
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Lucas Christian,,not per plan recall for inspection
BLD-Foundation1/4/20151/5/20151/6/2015APASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing12/23/201412/24/201412/24/2014APEND
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron crew needs to spin footing 90 degs it needs to be a side loader
BLD-Footing12/23/201412/23/201412/23/2014PCANC
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Foundation12/12/201412/12/201412/12/2014APASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing12/10/201412/11/201412/11/2014PPASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing12/9/201412/10/201412/11/2014PPASS
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Conference12/9/201412/10/201412/10/2014ACANC
DetailsDave Hannah
Subsoil visual before compaction rock installed. Phone #: ###-#### >> Inspection requested via web by Lucas Christian Inspection cancelled from web by: Lucas Christian
BLD-Footing12/8/201412/9/201412/9/2014PNR
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Conference12/7/201412/8/201412/8/2014ACANC
DetailsDave Hannah
Pre-dig erosion control insp. Can we schedule to meet at 1200 monday afternoon? Luke Phone #: ###-#### >> Inspection requested via web by Lucas Christian Inspection cancelled from web by: Lucas Christian