BLD-Final | 6/12/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 6/12/2015 | 6/12/2015 | 6/12/2015 | P | PASS |
Jim Sly
|
|
|
Framing and 2 layers of 5/8 gyp on East side of wall was completed on this permit (2hr wall ). Inspected and OK. When Jimmy Johns occupied space on other side of 2 HR wall .........other 2 layers of rock was completed and inspected on Permit # BLD 15-00402. Jim Sly.
|
FIRE-Final Inspection | 6/1/2015 | 6/2/2015 | 6/2/2015 | A | CANC |
Troy Cobbley
|
|
|
Zach Phone #: ###-####
|
BLD-Final | 6/1/2015 | 6/1/2015 | 6/1/2015 | P | CANC |
Jim Sly
|
|
|
Conference - Zach Phone #: ###-####
|
FIRE-Final Inspection | 12/18/2014 | 12/19/2014 | 12/19/2014 | A | FAIL |
Troy Cobbley
|
|
|
Wrong address called in. No city approved plans and address appears wrong. Brian needs to meet with Boise City Addressing to straighten out.
|
BLD-Framing/Rough-in | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | FAIL |
Jim Sly
|
|
|
Robert, sorry no # left on machine C/N Architect to provide fix where 2 hr wall hits truss prior to reaching roof deck.
|