FIRE-Final Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Forrest France
|
|
|
C/N items finished. Fire life safety final approved.
|
BLD-Final | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Dave Hannah
|
|
|
has a FIR final set up too//Zack Phone #: ###-####
|
BLD-Final | 12/3/2014 | 12/3/2014 | 12/4/2014 | P | CANC |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
FIRE-Final Inspection | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | NR |
Forrest France
|
|
|
Project is not in condition for fire life safety final at this time. C/N items pending.
|
FIRE-Final Inspection | 12/2/2014 | 12/2/2014 | 12/3/2014 | P | NR |
Forrest France
|
|
|
Items needed prior to final include; suite address posted, ceiling tile throughout, missing doors installed, max. occ sign, fire extinguisher posted, project related fire sprinkler permit finaled.
|
BLD-Ceiling Grid Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Dave Hannah
|
|
|
as late as possible// Zack Phone #: ###-####
|