BLD-Final | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Jim Sly
|
|
|
Addition and patio cover // Joe Phone #: ###-####
|
DOC - Permit Finaled | 5/7/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Jim Sly
|
|
|
|
BLD-Conference | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | DONE |
Jim Sly
|
|
|
Joe Phone #: ###-#### WIP
|
BLD-Conference | 8/24/2018 | 8/27/2018 | 8/27/2018 | A | DONE |
Jim Sly
|
|
|
call 15 mins ahead Phone #: ###-#### WIP
|
BLD - Request for Extension | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-#### WIP.
|
BLD-Aging Inspection | 10/4/2017 | 10/4/2017 | 10/4/2017 | | DONE |
Jim Sly
|
|
|
WIP
|
BLD-Conference | 5/31/2017 | 5/31/2017 | 5/31/2017 | P | DONE |
Jim Sly
|
|
|
Advised Owner/ Contractor that he needs a permit to build a patio cover that is not included on the scope of work.
|
BLD-Framing/Rough-in | 5/22/2017 | 5/23/2017 | 5/23/2017 | A | PART |
Jim Sly
|
|
|
Joe Phone #: ###-#### Garage exterior shear nailing....OK.
|
BLD-Conference | 1/4/2017 | 1/4/2017 | 1/4/2017 | P | PASS |
Jim Sly
|
|
|
joe Phone #: ###-#### WIP
|
BLD-Conference | 8/9/2016 | 8/10/2016 | 8/10/2016 | P | DONE |
Jim Sly
|
|
|
Joe Phone #: ###-####-would like as late as possible WIP.
|
BLD-Conference | 2/3/2016 | 2/5/2016 | 2/5/2016 | A | DONE |
Jim Sly
|
|
|
Joe Phone #: ###-#### WIP
|
BLD-Conference | 9/2/2015 | 9/3/2015 | 9/3/2015 | A | DONE |
Jim Sly
|
|
|
Joe Phone #: ###-#### WIP.
|
BLD-Footing | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | PASS |
Jim Sly
|
|
|
Joe// please call before Phone #: ###-####
|
BLD-Wall Bracing | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-####
|
BLD-Conference | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | DONE |
Jim Sly
|
|
|
Joe Phone #: ###-####
|
BLD-Foundation | 11/3/2014 | 11/3/2014 | 11/3/2014 | P | PASS |
Jim Sly
|
|
|
Adam// concrete set for 4:30pm Phone #: ###-####
|
BLD-Footing | 10/24/2014 | 10/27/2014 | 10/27/2014 | P | PART |
Jim Sly
|
|
|
Adam Phone #: ###-#### Addition only.....OK (not Garage)
|