BLD-Final | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | PASS |
Mike Jordan
|
|
|
Pete-pleae call 30 minutes prior to meet Phone #: ###-####
|
DOC - Permit Finaled | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Framing/Rough-in | 3/2/2015 | 3/3/2015 | 3/3/2015 | A | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####
|
BLD-Framing/Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | A | PASS |
Mike Jordan
|
|
|
Keith-please call 1/2 hr prior to meet-Partial Framing-late AM if possible Phone #: ###-####
|
BLD-Framing/Rough-in | 2/5/2015 | 2/5/2015 | 2/5/2015 | P | FAIL |
Mike Jordan
|
|
|
Keith// please call 30 min prior Phone #: ###-####. Cannot connect top of framing to grid, no box header present at top of glass or adequate connection for mullions. Provide new detail detail showing top of wall at glass and mullion connections, braced to structure above, leaving grid as independant system.
|
FIRE-Conference | 1/21/2015 | 1/22/2015 | 1/22/2015 | A | DONE |
Troy Cobbley
|
|
|
Went over sprinkler and fire alarm device placement for the new conference room. Keith Phone # ###-####
|
FIRE-Conference | 1/20/2015 | 1/21/2015 | 1/21/2015 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Keith-please call to schedule Phone #: ###-####
|