BLD-Conference | 6/29/2016 | 6/29/2016 | 5/10/2017 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Aging Inspection | 3/29/2017 | 3/29/2017 | 4/3/2017 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/28/2017 | 3/28/2017 | 4/3/2017 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 4/3/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 11/14/2016 | 11/15/2016 | 11/16/2016 | A | PASS |
Dave Hannah
|
|
|
Follow up with Adam ###-####
|
BLD-Final | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | DONE |
Bob Archibald
|
|
|
Final inspection request for City Center Core and Shell. Coordination with Angie Brosious and Scott Arellano. Contact Adam w/ESI when able to walk the project. Thank You. akj. Phone #: ###-#### .Inspection requested via web by Adam Johnson. Pending other trades and bonding for remaining work life safety appears complete.
|
FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Jim Page
|
|
|
Final Fire Life Safety inspection complete.
|
BLD-Conference | 11/8/2016 | 11/8/2016 | 11/9/2016 | P | PEND |
Dave Hannah
|
|
|
Meet to discuss inspection status. Call Adam prior to site visit. ###-####. Thanks, akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 9/26/2016 | 9/26/2016 | 9/27/2016 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 9/13/2016 | 9/13/2016 | 9/22/2016 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 9/15/2016 | 9/15/2016 | 9/22/2016 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
FIRE-Final Inspection | 9/20/2016 | 9/21/2016 | 9/21/2016 | P | CANC |
Jim Page
|
|
|
Inspection request was for convention center side of building, this inspection request is cancelled.
|
BLD-Conference | 9/19/2016 | 9/19/2016 | 9/20/2016 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 9/12/2016 | 9/12/2016 | 9/13/2016 | P | PASS |
Dave Hannah
|
|
|
Inspection walk of GBAD Stair Assemblies, etc. AKJ, Call when on site. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 9/9/2016 | 9/9/2016 | 9/12/2016 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 9/8/2016 | 9/8/2016 | 9/8/2016 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 9/6/2016 | 9/6/2016 | 9/6/2016 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 8/26/2016 | 8/26/2016 | 9/2/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 8/29/2016 | 8/29/2016 | 9/2/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Final | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PART |
Dave Hannah
|
|
|
Nathan// 10th floor Phone #: ###-#### ok for temp occ
|
BLD-Conference | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | CANC |
Dave Hannah
|
|
|
Contact adam when available to walk this afternoon. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 8/30/2016 | 8/31/2016 | 8/31/2016 | A | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 8/25/2016 | 8/25/2016 | 8/29/2016 | P | PART |
Dave Hannah
|
|
|
Few items in GBAD. Call Adam when heading to site. thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 8/23/2016 | 8/23/2016 | 8/24/2016 | P | PART |
Dave Hannah
|
|
|
Daily inspection walk. Call adam when you are heading to site. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 8/8/2016 | 8/8/2016 | 8/23/2016 | P | PART |
Dave Hannah
|
|
|
Review OH in west corridor 1st floor retail spaces. Other Misc items. Outline items for week of 8/8/16. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 8/11/2016 | 8/11/2016 | 8/23/2016 | P | PART |
Dave Hannah
|
|
|
Daily walk with Adam. Call Adam when on site. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 8/22/2016 | 8/22/2016 | 8/23/2016 | P | PART |
Dave Hannah
|
|
|
Ongoing inspection with shell and core installations. Call Adam when on site. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 8/18/2016 | 8/19/2016 | 8/19/2016 | P | PART |
Mike Jordan
|
|
|
Final, Area C Retail. Call adam when on site. thanks. AKJ GBAD Misc Framing, approve for cover. 5th Floor Final reinspection.
Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson. Ok for temp occ on 5th. floor core restrooms, lockers, and showers only. A seperate permit will be required to occupy remainder of 5th. floor. Ok for temp. occ on area C retail for BSU bike storage. All requirements have been met of signed letter for 90 day temp occ. Interior steel stud framed walls and soffits, for first floor GBAD lobby. No exterior walls can be covered in this area yet. Hardlids in basement for womens restroom. Contractor to remove sheet rock from mens restroom for hardlid inspection. 4th floor ceiling grid at north ball room ok only.
|
FIRE-Final Inspection | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PART |
Jim Page
|
|
|
Inspection is for temporary bike storage located at the northeast corner of level 1, no fire sprinkler modifications needed, fire alarm modifications will be notated on as-builds on the fire alarm plans, fire extinguisher is in place with a current inspection tag. Final life fire safety for temporary bike storage passed/complete.
|
BLD-Conference | 8/18/2016 | 8/18/2016 | 8/19/2016 | P | CANC |
Mike Jordan
|
|
|
Ongoing walks of GBAD areas, stairs, walls for cover. Contact Adam when available. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Final Inspection | 8/17/2016 | 8/18/2016 | 8/18/2016 | A | PART |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is mounted in a path of common travel with a current inspection tag. Final life fire safety inspection for level 10 penthouse and mechanical room passed/complete. Post fire smoke evacuation system needs to be tested/inspected for entire building before core and shell permit can be finaled for life fire safety.
|
BLD-Conference | 8/17/2016 | 8/17/2016 | 8/17/2016 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####. OK to drop tile in corridor 123. All fire stopping completed at 2hr shaft.
|
BLD-Conference | 8/16/2016 | 8/16/2016 | 8/16/2016 | P | PART |
Mike Jordan
|
|
|
PM inspection walk. Items TBD. Call Adam when heading to site, ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson. Ok to one side stair enclosure, level 1 t0 4. Vapor level 2 ok, level 2 soffits ok. Level 4 and level 5 fire stop on elevator shafts, interior side ok.
|
BLD-Conference | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PART |
Mike Jordan
|
|
|
Daily inspection walk. Hannah out, call Adam when available, we can walk todays current needs. Thanks Much, ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson. 2hr. lid and walls for 2hr. corridor in kitchen, restroom hardlids in kitchen, Vapor barrier 4th floor exterior, stairway #4, 2hr. assembly at first landing, soffits 4th floor, hardlids 4th floor restrooms, 5th floor z channel at elevators.
|
BLD-Conference | 8/9/2016 | 8/10/2016 | 8/11/2016 | P | PASS |
Dave Hannah
|
|
|
Inspection walk with adam. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 8/1/2016 | 8/1/2016 | 8/5/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 7/29/2016 | 7/29/2016 | 8/5/2016 | P | PART |
Dave Hannah
|
|
|
Verification of Thursday Items to complete walk, mechanical fire stop assemblies at floors. Fire rated hatches, and 4th floor elevator lobby verification for cover. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 7/29/2016 | 7/29/2016 | 8/5/2016 | A | PART |
Dave Hannah
|
|
|
C1-C2 elevator shaft for compliance. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok to cover
|
BLD-Conference | 8/1/2016 | 8/2/2016 | 8/5/2016 | A | PEND |
Dave Hannah
|
|
|
|
BLD-Conference | 8/1/2016 | 8/2/2016 | 8/5/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-#### core ok 2thru 8
|
BLD-Conference | 7/25/2016 | 7/25/2016 | 7/29/2016 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 7/27/2016 | 7/27/2016 | 7/29/2016 | P | PART |
Dave Hannah
|
|
|
Verify Elevator Lobbys 2, 4 for cover. Review other fire safing operations. 1st floor stair 2 exit corridor. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 7/27/2016 | 7/28/2016 | 7/29/2016 | P | PEND |
Dave Hannah
|
|
|
Review Elevator shafts C1,2,3. Review Remaining Lobbys, Review stair tower egress signage. Call Adam. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
FIRE-Conference | 7/27/2016 | 7/27/2016 | 7/27/2016 | A | DONE |
Jim Page
|
|
|
Fire conference complete. Discussed modifications to exit light placement/direction. Items that still need to be inspected: emergency egress lighting, fire alarm audio visual testing, in duct smoke detectors, mag lock release on fire doors, stairwell pressurization system, emergency power transfer and placement verificaion of fire extinguishers with current inspection tags from a licensed contractor.
|
BLD-Conference | 7/26/2016 | 7/26/2016 | 7/27/2016 | P | PEND |
Dave Hannah
|
|
|
Continued walk of FLS. Please call Adam when on site. Thanks, AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 7/22/2016 | 7/22/2016 | 7/27/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
FIRE-Conference | 7/26/2016 | 7/26/2016 | 7/26/2016 | P | CANC |
Jim Page
|
|
|
Fire conference rescheduled for 27JULY2016
|
BLD-Conference | 7/26/2016 | 7/26/2016 | 7/26/2016 | A | PASS |
Dave Hannah
|
|
|
First floor C-S restroom ceiling. First floor lobby ceiling approve for cover AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 7/6/2016 | 7/6/2016 | 7/18/2016 | P | CANC |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 7/13/2016 | 7/13/2016 | 7/14/2016 | P | PEND |
Dave Hannah
|
|
|
Adam
|
BLD-Conference | 6/28/2016 | 6/28/2016 | 7/12/2016 | P | DONE |
Dave Hannah
|
|
|
###-#### Adam
|
BLD-Conference | 7/11/2016 | 7/11/2016 | 7/12/2016 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 7/6/2016 | 7/8/2016 | 7/10/2016 | P | NR |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 7/6/2016 | 7/7/2016 | 7/8/2016 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-#### talked about exit passageway and smoke curtain
|
BLD-Conference | 7/5/2016 | 7/5/2016 | 7/5/2016 | P | PART |
Dave Hannah
|
|
|
adame Phone #: ###-#### ok to cover walls bathrooms 4th floor gbad
|
BLD-Conference | 7/1/2016 | 7/1/2016 | 7/1/2016 | P | PASS |
Dave Hannah
|
|
|
Review F Line expansion joint. Review 10th floor executive suite for cover. akj 7-1-16 Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 6/21/2016 | 6/21/2016 | 6/27/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 6/23/2016 | 6/23/2016 | 6/27/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 6/16/2016 | 6/16/2016 | 6/16/2016 | P | PART |
Dave Hannah
|
|
|
Adam- ###-#### 9th floor columns ok to cover
|
BLD-Conference | 6/3/2016 | 6/3/2016 | 6/14/2016 | P | PASS |
Dave Hannah
|
|
|
1st Floor Lobby, Soffits, approved for cover. 1st floor restroom if ready. akj 6-3-16 Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 6/10/2016 | 6/10/2016 | 6/10/2016 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 6/7/2016 | 6/7/2016 | 6/10/2016 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 5/27/2016 | 5/27/2016 | 6/3/2016 | P | PASS |
Dave Hannah
|
|
|
Catch up on any inspection needs with Mike Beeson. His cell ###-#### thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 6/2/2016 | 6/2/2016 | 6/3/2016 | P | PART |
Dave Hannah
|
|
|
CCP, PM Follow up on a few items. Call Adam at end of rotation. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 6/1/2016 | 6/2/2016 | 6/2/2016 | A | PASS |
Dave Hannah
|
|
|
1. Shell and Core Restrooms: a. 3rd Floor Clearwater b. 6th Floor Clearwater c. 8th Floor 1st floor shell and core restroom. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 6/1/2016 | 6/1/2016 | 6/2/2016 | P | CANC |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 5/12/2016 | 5/12/2016 | 5/26/2016 | P | DONE |
Dave Hannah
|
|
|
Document catch up. Also walk 1st floor mechanical shafts at 4 line. Other items as needed. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/23/2016 | 5/23/2016 | 5/26/2016 | P | PASS |
Dave Hannah
|
|
|
• Stair 1, Level 1 • Level 1 o Fire Command Center o Fire Pump Room • Elevator Lobbys o Level 5 o Level 6 o Level 7 o Level 8 • Shell and Core CW Restrooms o Level 6/7 Ceilings that were not inspected prior to cover o Review RM MECH inspections of Level 8 • Level 8 C/S Restroom o If MECH passed in women’s restroom (in Permit Binder) we will review for cover. • BSU elevator at Level 3, Top of shaft. Verify approval for cover • GBAD welded clips at East Elevation (MTI inspected) Visual inspection if needed. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/23/2016 | 5/23/2016 | 5/26/2016 | A | PASS |
Dave Hannah
|
|
|
• Stair 1, Level 1 • Level 1 o Fire Command Center o Fire Pump Room • Elevator Lobbys o Level 5 o Level 6 o Level 7 o Level 8 • Shell and Core CW Restrooms o Level 6/7 Ceilings that were not inspected prior to cover o Review RM MECH inspections of Level 8 • Level 8 C/S Restroom o If MECH passed in women’s restroom (in Permit Binder) we will review for cover. • BSU elevator at Level 3, Top of shaft. Verify approval for cover • GBAD welded clips at East Elevation (MTI inspected) Visual inspection if needed. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/13/2016 | 5/13/2016 | 5/23/2016 | P | PASS |
Dave Hannah
|
|
|
Follow up to yesterday''s walk. Stair 2: level 2-7. Ready for cover. 9th floor: slab edge ready for cover (e j) Thanks. Akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 5/10/2016 | 5/10/2016 | 5/23/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 5/16/2016 | 5/17/2016 | 5/18/2016 | A | PART |
Dave Hannah
|
|
|
Perimeter Framing and approval for cover of core and shell installations. Phone #: ###-#### Inspection requested via web by Adam Johnson 9th floor slab edge pass and ext wallinsulation
|
BLD-Conference | 5/17/2016 | 5/18/2016 | 5/18/2016 | P | PART |
Dave Hannah
|
|
|
Stair 2, 1st Floor, and 6-9th floor. Restroom at 9th Floor, Fire assemblies, review for cover. akj 5/17 Phone #: ###-#### Inspection requested via web by Adam Johnson Stair 2 ok to cover 1 thru 8
|
BLD-Conference | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | CANC |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 5/6/2016 | 5/6/2016 | 5/9/2016 | P | PART |
Dave Hannah
|
|
|
Possible Elevator Lobby 4-6 on Clearwater GBAD, Ballroom floor walls so we can drywall ; Commercial Kitchen walls: Elevator Machine Room core board wall; North side of Stair #4 level 1 to 4th. Call when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson see areas in books for areas ok to cover walled with bob
|
BLD-Conference | 5/4/2016 | 5/4/2016 | 5/5/2016 | P | PART |
Dave Hannah
|
|
|
Stair 1 Level 6, 7, 8 Cover. Phone #: ###-#### Inspection requested via web by Adam Johnson ok to cover
|
BLD-Conference | 4/28/2016 | 4/28/2016 | 5/3/2016 | P | PART |
Dave Hannah
|
|
|
stair 1 levels 2and 3 ok to cover
|
BLD-Conference | 5/2/2016 | 5/2/2016 | 5/3/2016 | P | PART |
Dave Hannah
|
|
|
Clearwater, Stair 1, level 4-6 GBAD Elevator Machine Room Level 5.
Call Adam when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson stair 1 levels 4and 5 ok to cover
|
BLD-Conference | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PART |
Dave Hannah
|
|
|
Inspection walk both buildings. TBD. Akj Stair 1, levels 2,3,4 review for cover. Phone #: ###-#### Inspection requested via web by Adam Johnson stair one frools 2 and 3 ok to cover
|
BLD-Conference | 4/26/2016 | 4/26/2016 | 4/28/2016 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-#### elec room 9th floor ok to cover
|
BLD-Conference | 4/27/2016 | 4/27/2016 | 4/28/2016 | P | CANC |
Dave Hannah
|
|
|
would like call ahead; Adam Phone #: ###-####
|
BLD-Conference | 4/21/2016 | 4/22/2016 | 4/24/2016 | A | CANC |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Framing/Rough-in | 4/22/2016 | 4/22/2016 | 4/24/2016 | P | FAIL |
Dave Hannah
|
|
|
Adam Phone #: ###-#### replace/patch fire proofing on bottom of beam penthouse
|
BLD-Conference | 4/18/2016 | 4/18/2016 | 4/19/2016 | P | NR |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 4/14/2016 | 4/14/2016 | 4/15/2016 | P | DONE |
Dave Hannah
|
|
|
would like call ahead; Adam Phone #: ###-####
|
BLD-Conference | 4/11/2016 | 4/12/2016 | 4/15/2016 | A | PASS |
Dave Hannah
|
|
|
City Center, Walk GBAD, Stair D-6, shaft wall construction, want to insulate. Also verification of fireproofing at F Line 3rd floor. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 4/8/2016 | 4/8/2016 | 4/9/2016 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 4/4/2016 | 4/4/2016 | 4/5/2016 | P | PART |
Dave Hannah
|
|
|
Adam Phone #: ###-#### see plans inoffice for areas ok to cover
|
BLD-Conference | 3/30/2016 | 3/30/2016 | 3/31/2016 | P | PEND |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 3/30/2016 | 3/31/2016 | 3/31/2016 | A | PASS |
Dave Hannah
|
|
|
2nd and 3rd floor slab edge at CW, NW corners, complete. Review fireproofing at Exterior Column F/2, F/3. Additional items may come up, call adam when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/28/2016 | 3/28/2016 | 3/29/2016 | P | PART |
Dave Hannah
|
|
|
Dave, catching up on last week. Lets walk 2/3rd floor curtain wall. 8th floor slab Edge. Also, Stair 2 monokote 2-8th. , F/3 column fire spray, North Side. Call Adam when available. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/21/2016 | 3/25/2016 | 3/25/2016 | P | DEFR |
Mike Jordan
|
|
|
Standing Inspection walk in Adams absence. Please get with Mike Koci when on site.akj Phone #: ###-#### Inspection requested via web by Adam Johnson. No time.
|
BLD-Conference | 3/21/2016 | 3/24/2016 | 3/25/2016 | P | PART |
Dave Hannah
|
|
|
Standing Inspection walk in Adams absence. Please get with Mike Koci when on site.akj Phone #: ###-#### Inspection requested via web by Adam Johnson see sing off book
|
BLD-Conference | 3/21/2016 | 3/21/2016 | 3/23/2016 | P | PASS |
Dave Hannah
|
|
|
BSU Slab Edge 2 and 3. C/S restroom Shaft wall firestop, rated wall.2 thru 8. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/21/2016 | 3/23/2016 | 3/23/2016 | P | PART |
Dave Hannah
|
|
|
Standing Inspection walk in Adams absence. Please get with Mike Koci when on site.Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/16/2016 | 3/16/2016 | 3/21/2016 | P | PASS |
Dave Hannah
|
|
|
3rd Floor verification of Slab Edge Perimeter. Call Adam. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/17/2016 | 3/17/2016 | 3/21/2016 | P | PASS |
Dave Hannah
|
|
|
2nd and 3rd floor slab edge. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/15/2016 | 3/15/2016 | 3/17/2016 | P | DONE |
Dave Hannah
|
|
|
Meet to update inspection binder. Call Adam. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/14/2016 | 3/14/2016 | 3/16/2016 | P | PEND |
Dave Hannah
|
|
|
Continued walk. Verification of slab edge spray, 6th floor. Interior 2 side verification at 2nd and 3rd floors. Call Adam when available. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/9/2016 | 3/9/2016 | 3/14/2016 | P | PEND |
Dave Hannah
|
|
|
Wed Walk TBD. 6th Floor Slab edge fire stop. Fire Stop Assemblies. Call Adam to confirm walk prior to visit. Thanks Much. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/8/2016 | 3/8/2016 | 3/14/2016 | P | PART |
Dave Hannah
|
|
|
Continued inspection of safing at slab edge, 2nd floor BSU TI should be complete, followed by 6th Floor of CW TI. Check progress of fire spray patching on 6th floor S/C Columns. Also, Review 1st floor demsing wall at F Line, Electrical has signed off, would like to hang this wall. Notify Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 3/11/2016 | 3/11/2016 | 3/14/2016 | P | CANC |
Dave Hannah
|
|
|
Walk CCP 9 story. Core and Shell Firestop at floor penetrations (restrooms) 8 down. Review of spray hilti application 6th floor. Double check 2 and 3 for shell and core/TI interface. Call Adam. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson core bathrooms floors 2 thru 6 ok for plumbing fire stopping
|
BLD-Other | 3/7/2016 | 3/7/2016 | 3/8/2016 | P | PEND |
Dave Hannah
|
|
|
Continued inspection of safing at slab edge, 2nd floor BSU TI. Check thru penetrations covered by column wraps, 3rd floor, NE of Stair 1.Notify Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 2/25/2016 | 3/2/2016 | 3/7/2016 | A | PEND |
Dave Hannah
|
|
|
Adam---###-####
|
BLD-Framing/Rough-in | 3/2/2016 | 3/2/2016 | 3/7/2016 | P | PEND |
Dave Hannah
|
|
|
Adam---###-####
|
BLD-Conference | 3/2/2016 | 3/3/2016 | 3/7/2016 | P | PEND |
Dave Hannah
|
|
|
City Center - Clearwater, Continued inspection on 5, 4, 3, and possibly 2. Check in With CBI on Floor Stop assembly. Call Adam when on site, ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Other | 3/4/2016 | 3/4/2016 | 3/7/2016 | P | PEND |
Dave Hannah
|
|
|
Ongoing inspection of Clearwater. Fire Stop assembly at Slab edge. Verification of fire patching on structural columns. Ongoing job walk, followed by inspection to respective TI''s, Call Adam, ###-####, Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Conference | 2/29/2016 | 3/1/2016 | 3/3/2016 | P | PEND |
Dave Hannah
|
|
|
Adam-as per Adam inspection doens''t have anything to do with the plan mod thats in review Phone #: ###-####
|
BLD-Conference | 2/25/2016 | 2/26/2016 | 3/3/2016 | A | DONE |
Dave Hannah
|
|
|
Adam--- ###-####
|
BLD-Conference | 2/24/2016 | 2/25/2016 | 2/26/2016 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 12/22/2015 | 12/22/2015 | 12/23/2015 | P | DONE |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Other | 10/14/2015 | 10/14/2015 | 10/15/2015 | P | PASS |
Dave Hannah
|
|
|
Framing infill at block 22, requested by Adam. call when on site, ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 10/5/2015 | 10/5/2015 | 10/7/2015 | P | PART |
Dave Hannah
|
|
|
adam - call prior - clearwater - arena firewall Phone #: ###-#### ok to start
|
BLD-Framing/Rough-in | 9/24/2015 | 9/24/2015 | 9/24/2015 | P | PART |
Jim Sly
|
|
|
contact first - adam Phone #: ###-#### Ext walls 4 line grids J- G 5 .....3rd flr thru 5th.
|
BLD-Framing/Rough-in | 9/10/2015 | 9/11/2015 | 9/11/2015 | A | PART |
Phil Shearer
|
|
|
Adam - Call prior to meet - Framing inspection, Metal Stud welding verification Phone #: ###-####. Stud welding east side grid L - J and stiff clips north side floors 4-8 grid 2-4
|
BLD-Framing/Rough-in | 9/3/2015 | 9/4/2015 | 9/4/2015 | P | PEND |
Dave Hannah
|
|
|
adam - east elevation Phone #: ###-####
|
BLD-Framing/Rough-in | 9/1/2015 | 9/1/2015 | 9/2/2015 | P | NR |
Dave Hannah
|
|
|
Adam - structural walk, Exterior framing, and interior shaft walls Phone #: ###-####
|
BLD-Conference | 8/9/2016 | 8/9/2016 | | A | |
|
|
|
Inspection walk with adam. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Conference | 6/30/2016 | 6/30/2016 | | P | |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 6/27/2016 | 6/27/2016 | | P | |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Conference | 5/25/2016 | 5/26/2016 | | P | |
Dave Hannah
|
|
|
Shell and Core restrooms 2,3,4,5,6,8 ready for ceiling cover. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Conference | 5/24/2016 | 5/24/2016 | | P | |
Dave Hannah
|
|
|
Mech has approved CW Shell and Core Restrooms, 2, 3, 4, 5, 6. Ready for cover. Check assembly at North Wall, Women''s Restroom at 7th Floor. akj.
Call on your way over, we can start at 7 and work down. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|