Information based on query as of Wednesday, June 19, 2024.
Permit Information
Permit NumberBLD14-03207
StatusFinaled
Name ESI
Site Address 777 W MAIN ST
Project NameCity Center Plaza
Customer Number 
ePlanReviewYes
Description
(CITY CENTER PLAZA - Shell and Core Only) (10-5-16 PLAN MODIFICATION TO REMOVE THE ESCALATORS AND THE CONCOURSE LINK FROM THE SHELL AND CORE SCOPE OF WORK AND TO DO THAT WORK UNDER NEW PERMIT BLD16-03512 FOR THE ESCALATORS AND NEW PERMIT BLD16-03511 FOR THE CONCOURSE LINK.) To complete the shell, core and exterior finishes for the 299,750 square foot, nine story office, retail, parking garage and convention center building with a 44,050 square foot, below grade bus transit center. Plan Modification 6-22-16 - Modification to add windows from "Executive Office" to the gym on the 9th floor below. **TLW** PLAN MODIFICATION 4-1-16 - Modification to add common hallway and bathrooms. **TLW** PLAN MODIFICATION 1-5-16 – Modification submitted to add a 1,200 square foot 10th floor. The 10th floor modification includes: [structural modifications to include: new floor, roof, 316 square foot terrace, a second stair, and exterior walls], new plumbing, new electrical, mew mechanical, and new interior and exterior finishes. **TLW** PLAN MODIFICATION 9-3-15 – Modification submitted to modify structure and layout to accommodate finalized freight elevators and machine rooms.**TLW** This building is considered an addition to the existing approximate 304,610 square foot US Bank high rise building for allowable area, exterior opening and wall requirements. The existing high rise and new high rise addition will have separate sprinkler and alarm systems, as well as, their own fire command centers. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM ***HIGH PRIORITY REVIEW***Contact Angie Brosious with any issues.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/29/20166/29/20165/10/2017PDONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Aging Inspection3/29/20173/29/20174/3/2017 PASS
DetailsDave Hannah
BLD-Aging Inspection3/28/20173/28/20174/3/2017 PASS
DetailsDave Hannah
DOC - Permit Finaled4/3/20174/3/20174/3/2017APASS
DetailsDave Hannah
BLD-Conference11/14/201611/15/201611/16/2016APASS
DetailsDave Hannah
Follow up with Adam ###-####
BLD-Final11/14/201611/14/201611/14/2016PDONE
DetailsBob Archibald
Final inspection request for City Center Core and Shell. Coordination with Angie Brosious and Scott Arellano. Contact Adam w/ESI when able to walk the project. Thank You. akj. Phone #: ###-#### .Inspection requested via web by Adam Johnson. Pending other trades and bonding for remaining work life safety appears complete.
FIRE-Final Inspection11/14/201611/14/201611/14/2016PPASS
DetailsJim Page
Final Fire Life Safety inspection complete.
BLD-Conference11/8/201611/8/201611/9/2016PPEND
DetailsDave Hannah
Meet to discuss inspection status. Call Adam prior to site visit. ###-####. Thanks, akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference10/11/201610/11/201610/11/2016PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference9/26/20169/26/20169/27/2016PPART
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference9/13/20169/13/20169/22/2016PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference9/15/20169/15/20169/22/2016PPASS
DetailsDave Hannah
Adam Phone #: ###-####
FIRE-Final Inspection9/20/20169/21/20169/21/2016PCANC
DetailsJim Page
Inspection request was for convention center side of building, this inspection request is cancelled.
BLD-Conference9/19/20169/19/20169/20/2016PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference9/12/20169/12/20169/13/2016PPASS
DetailsDave Hannah
Inspection walk of GBAD Stair Assemblies, etc. AKJ, Call when on site. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference9/9/20169/9/20169/12/2016PPART
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference9/8/20169/8/20169/8/2016PDONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference9/6/20169/6/20169/6/2016PDONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference8/26/20168/26/20169/2/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference8/29/20168/29/20169/2/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Final9/1/20169/2/20169/2/2016APART
DetailsDave Hannah
Nathan// 10th floor Phone #: ###-#### ok for temp occ
BLD-Conference8/31/20168/31/20168/31/2016PCANC
DetailsDave Hannah
Contact adam when available to walk this afternoon. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference8/30/20168/31/20168/31/2016APASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference8/25/20168/25/20168/29/2016PPART
DetailsDave Hannah
Few items in GBAD. Call Adam when heading to site. thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference8/23/20168/23/20168/24/2016PPART
DetailsDave Hannah
Daily inspection walk. Call adam when you are heading to site. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference8/8/20168/8/20168/23/2016PPART
DetailsDave Hannah
Review OH in west corridor 1st floor retail spaces. Other Misc items. Outline items for week of 8/8/16. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference8/11/20168/11/20168/23/2016PPART
DetailsDave Hannah
Daily walk with Adam. Call Adam when on site. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference8/22/20168/22/20168/23/2016PPART
DetailsDave Hannah
Ongoing inspection with shell and core installations. Call Adam when on site. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference8/18/20168/19/20168/19/2016PPART
DetailsMike Jordan
Final, Area C Retail. Call adam when on site. thanks. AKJ
GBAD Misc Framing, approve for cover.
5th Floor Final reinspection.

Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson. Ok for temp occ on 5th. floor core restrooms, lockers, and showers only. A seperate permit will be required to occupy remainder of 5th. floor. Ok for temp. occ on area C retail for BSU bike storage. All requirements have been met of signed letter for 90 day temp occ. Interior steel stud framed walls and soffits, for first floor GBAD lobby. No exterior walls can be covered in this area yet. Hardlids in basement for womens restroom. Contractor to remove sheet rock from mens restroom for hardlid inspection. 4th floor ceiling grid at north ball room ok only.
FIRE-Final Inspection8/18/20168/19/20168/19/2016APART
DetailsJim Page
Inspection is for temporary bike storage located at the northeast corner of level 1, no fire sprinkler modifications needed, fire alarm modifications will be notated on as-builds on the fire alarm plans, fire extinguisher is in place with a current inspection tag. Final life fire safety for temporary bike storage passed/complete.
BLD-Conference8/18/20168/18/20168/19/2016PCANC
DetailsMike Jordan
Ongoing walks of GBAD areas, stairs, walls for cover. Contact Adam when available. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Final Inspection8/17/20168/18/20168/18/2016APART
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguisher is mounted in a path of common travel with a current inspection tag. Final life fire safety inspection for level 10 penthouse and mechanical room passed/complete. Post fire smoke evacuation system needs to be tested/inspected for entire building before core and shell permit can be finaled for life fire safety.
BLD-Conference8/17/20168/17/20168/17/2016PPASS
DetailsMike Jordan
Adam Phone #: ###-####. OK to drop tile in corridor 123. All fire stopping completed at 2hr shaft.
BLD-Conference8/16/20168/16/20168/16/2016PPART
DetailsMike Jordan
PM inspection walk. Items TBD. Call Adam when heading to site, ###-####. Thanks, AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson. Ok to one side stair enclosure, level 1 t0 4. Vapor level 2 ok, level 2 soffits ok. Level 4 and level 5 fire stop on elevator shafts, interior side ok.
BLD-Conference8/15/20168/15/20168/15/2016PPART
DetailsMike Jordan
Daily inspection walk. Hannah out, call Adam when available, we can walk todays current needs. Thanks Much, ###-####. Phone #: ###-#### Inspection requested via web by Adam Johnson. 2hr. lid and walls for 2hr. corridor in kitchen, restroom hardlids in kitchen, Vapor barrier 4th floor exterior, stairway #4, 2hr. assembly at first landing, soffits 4th floor, hardlids 4th floor restrooms, 5th floor z channel at elevators.

BLD-Conference8/9/20168/10/20168/11/2016PPASS
DetailsDave Hannah
Inspection walk with adam. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference8/1/20168/1/20168/5/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference7/29/20167/29/20168/5/2016PPART
DetailsDave Hannah
Verification of Thursday Items to complete walk, mechanical fire stop assemblies at floors. Fire rated hatches, and 4th floor elevator lobby verification for cover. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference7/29/20167/29/20168/5/2016APART
DetailsDave Hannah
C1-C2 elevator shaft for compliance. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok to cover
BLD-Conference8/1/20168/2/20168/5/2016APEND
DetailsDave Hannah
BLD-Conference8/1/20168/2/20168/5/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-#### core ok 2thru 8
BLD-Conference7/25/20167/25/20167/29/2016PPART
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference7/27/20167/27/20167/29/2016PPART
DetailsDave Hannah
Verify Elevator Lobbys 2, 4 for cover. Review other fire safing operations. 1st floor stair 2 exit corridor. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference7/27/20167/28/20167/29/2016PPEND
DetailsDave Hannah
Review Elevator shafts C1,2,3. Review Remaining Lobbys, Review stair tower egress signage. Call Adam. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Conference7/27/20167/27/20167/27/2016ADONE
DetailsJim Page
Fire conference complete. Discussed modifications to exit light placement/direction. Items that still need to be inspected: emergency egress lighting, fire alarm audio visual testing, in duct smoke detectors, mag lock release on fire doors, stairwell pressurization system, emergency power transfer and placement verificaion of fire extinguishers with current inspection tags from a licensed contractor.
BLD-Conference7/26/20167/26/20167/27/2016PPEND
DetailsDave Hannah
Continued walk of FLS. Please call Adam when on site. Thanks, AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference7/22/20167/22/20167/27/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
FIRE-Conference7/26/20167/26/20167/26/2016PCANC
DetailsJim Page
Fire conference rescheduled for 27JULY2016
BLD-Conference7/26/20167/26/20167/26/2016APASS
DetailsDave Hannah
First floor C-S restroom ceiling.
First floor lobby ceiling approve for cover AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference7/6/20167/6/20167/18/2016PCANC
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference7/13/20167/13/20167/14/2016PPEND
DetailsDave Hannah
Adam
BLD-Conference6/28/20166/28/20167/12/2016PDONE
DetailsDave Hannah
###-#### Adam
BLD-Conference7/11/20167/11/20167/12/2016PDONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference7/6/20167/8/20167/10/2016PNR
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference7/6/20167/7/20167/8/2016PDONE
DetailsDave Hannah
Adam Phone #: ###-#### talked about exit passageway and smoke curtain
BLD-Conference7/5/20167/5/20167/5/2016PPART
DetailsDave Hannah
adame Phone #: ###-#### ok to cover walls bathrooms 4th floor gbad
BLD-Conference7/1/20167/1/20167/1/2016PPASS
DetailsDave Hannah
Review F Line expansion joint. Review 10th floor executive suite for cover. akj 7-1-16 Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference6/21/20166/21/20166/27/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference6/23/20166/23/20166/27/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference6/16/20166/16/20166/16/2016PPART
DetailsDave Hannah
Adam- ###-#### 9th floor columns ok to cover
BLD-Conference6/3/20166/3/20166/14/2016PPASS
DetailsDave Hannah
1st Floor Lobby, Soffits, approved for cover. 1st floor restroom if ready. akj 6-3-16 Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference6/10/20166/10/20166/10/2016PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference6/7/20166/7/20166/10/2016PPASS
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference5/27/20165/27/20166/3/2016PPASS
DetailsDave Hannah
Catch up on any inspection needs with Mike Beeson. His cell ###-#### thanks. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference6/2/20166/2/20166/3/2016PPART
DetailsDave Hannah
CCP, PM Follow up on a few items. Call Adam at end of rotation. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference6/1/20166/2/20166/2/2016APASS
DetailsDave Hannah
1. Shell and Core Restrooms:
a. 3rd Floor Clearwater
b. 6th Floor Clearwater
c. 8th Floor
1st floor shell and core restroom.
Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference6/1/20166/1/20166/2/2016PCANC
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference5/12/20165/12/20165/26/2016PDONE
DetailsDave Hannah
Document catch up. Also walk 1st floor mechanical shafts at 4 line. Other items as needed. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference5/23/20165/23/20165/26/2016PPASS
DetailsDave Hannah
• Stair 1, Level 1
• Level 1
o Fire Command Center
o Fire Pump Room
• Elevator Lobbys
o Level 5
o Level 6
o Level 7
o Level 8
• Shell and Core CW Restrooms
o Level 6/7 Ceilings that were not inspected prior to cover
o Review RM MECH inspections of Level 8
• Level 8 C/S Restroom
o If MECH passed in women’s restroom (in Permit Binder) we will review for cover.
• BSU elevator at Level 3, Top of shaft. Verify approval for cover
• GBAD welded clips at East Elevation (MTI inspected) Visual inspection if needed.
Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference5/23/20165/23/20165/26/2016APASS
DetailsDave Hannah
• Stair 1, Level 1
• Level 1
o Fire Command Center
o Fire Pump Room
• Elevator Lobbys
o Level 5
o Level 6
o Level 7
o Level 8
• Shell and Core CW Restrooms
o Level 6/7 Ceilings that were not inspected prior to cover
o Review RM MECH inspections of Level 8
• Level 8 C/S Restroom
o If MECH passed in women’s restroom (in Permit Binder) we will review for cover.
• BSU elevator at Level 3, Top of shaft. Verify approval for cover
• GBAD welded clips at East Elevation (MTI inspected) Visual inspection if needed.
Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference5/13/20165/13/20165/23/2016PPASS
DetailsDave Hannah
Follow up to yesterday''s walk.
Stair 2: level 2-7. Ready for cover.
9th floor: slab edge ready for cover (e j)
Thanks. Akj.
Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in5/10/20165/10/20165/23/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference5/16/20165/17/20165/18/2016APART
DetailsDave Hannah
Perimeter Framing and approval for cover of core and shell installations. Phone #: ###-#### Inspection requested via web by Adam Johnson 9th floor slab edge pass and ext wallinsulation
BLD-Conference5/17/20165/18/20165/18/2016PPART
DetailsDave Hannah
Stair 2, 1st Floor, and 6-9th floor. Restroom at 9th Floor, Fire assemblies, review for cover. akj 5/17 Phone #: ###-#### Inspection requested via web by Adam Johnson Stair 2 ok to cover 1 thru 8
BLD-Conference5/9/20165/10/20165/10/2016ACANC
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference5/6/20165/6/20165/9/2016PPART
DetailsDave Hannah
Possible Elevator Lobby 4-6 on Clearwater
GBAD, Ballroom floor walls so we can drywall ; Commercial Kitchen walls: Elevator Machine Room core board wall; North side of Stair #4 level 1 to 4th. Call when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson see areas in books for areas ok to cover walled with bob
BLD-Conference5/4/20165/4/20165/5/2016PPART
DetailsDave Hannah
Stair 1 Level 6, 7, 8 Cover. Phone #: ###-#### Inspection requested via web by Adam Johnson ok to cover
BLD-Conference4/28/20164/28/20165/3/2016PPART
DetailsDave Hannah
stair 1 levels 2and 3 ok to cover
BLD-Conference5/2/20165/2/20165/3/2016PPART
DetailsDave Hannah
Clearwater, Stair 1, level 4-6
GBAD Elevator Machine Room Level 5.

Call Adam when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson stair 1 levels 4and 5 ok to cover
BLD-Conference4/28/20164/29/20164/29/2016APART
DetailsDave Hannah
Inspection walk both buildings. TBD. Akj Stair 1, levels 2,3,4 review for cover. Phone #: ###-#### Inspection requested via web by Adam Johnson stair one frools 2 and 3 ok to cover
BLD-Conference4/26/20164/26/20164/28/2016PPART
DetailsDave Hannah
Adam Phone #: ###-#### elec room 9th floor ok to cover
BLD-Conference4/27/20164/27/20164/28/2016PCANC
DetailsDave Hannah
would like call ahead; Adam Phone #: ###-####
BLD-Conference4/21/20164/22/20164/24/2016ACANC
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Framing/Rough-in4/22/20164/22/20164/24/2016PFAIL
DetailsDave Hannah
Adam Phone #: ###-#### replace/patch fire proofing on bottom of beam penthouse
BLD-Conference4/18/20164/18/20164/19/2016PNR
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference4/14/20164/14/20164/15/2016PDONE
DetailsDave Hannah
would like call ahead; Adam Phone #: ###-####
BLD-Conference4/11/20164/12/20164/15/2016APASS
DetailsDave Hannah
City Center, Walk GBAD, Stair D-6, shaft wall construction, want to insulate. Also verification of fireproofing at F Line 3rd floor. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference4/8/20164/8/20164/9/2016PDONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference4/4/20164/4/20164/5/2016PPART
DetailsDave Hannah
Adam Phone #: ###-#### see plans inoffice for areas ok to cover
BLD-Conference3/30/20163/30/20163/31/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference3/30/20163/31/20163/31/2016APASS
DetailsDave Hannah
2nd and 3rd floor slab edge at CW, NW corners, complete. Review fireproofing at Exterior Column F/2, F/3. Additional items may come up, call adam when available. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/28/20163/28/20163/29/2016PPART
DetailsDave Hannah
Dave, catching up on last week. Lets walk 2/3rd floor curtain wall. 8th floor slab Edge. Also, Stair 2 monokote 2-8th. , F/3 column fire spray, North Side. Call Adam when available. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/21/20163/25/20163/25/2016PDEFR
DetailsMike Jordan
Standing Inspection walk in Adams absence. Please get with Mike Koci when on site.akj Phone #: ###-#### Inspection requested via web by Adam Johnson. No time.
BLD-Conference3/21/20163/24/20163/25/2016PPART
DetailsDave Hannah
Standing Inspection walk in Adams absence. Please get with Mike Koci when on site.akj Phone #: ###-#### Inspection requested via web by Adam Johnson see sing off book
BLD-Conference3/21/20163/21/20163/23/2016PPASS
DetailsDave Hannah
BSU Slab Edge 2 and 3. C/S restroom Shaft wall firestop, rated wall.2 thru 8. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/21/20163/23/20163/23/2016PPART
DetailsDave Hannah
Standing Inspection walk in Adams absence. Please get with Mike Koci when on site.Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/16/20163/16/20163/21/2016PPASS
DetailsDave Hannah
3rd Floor verification of Slab Edge Perimeter. Call Adam. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/17/20163/17/20163/21/2016PPASS
DetailsDave Hannah
2nd and 3rd floor slab edge. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/15/20163/15/20163/17/2016PDONE
DetailsDave Hannah
Meet to update inspection binder. Call Adam. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/14/20163/14/20163/16/2016PPEND
DetailsDave Hannah
Continued walk. Verification of slab edge spray, 6th floor.
Interior 2 side verification at 2nd and 3rd floors. Call Adam when available. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/9/20163/9/20163/14/2016PPEND
DetailsDave Hannah
Wed Walk TBD. 6th Floor Slab edge fire stop. Fire Stop Assemblies. Call Adam to confirm walk prior to visit. Thanks Much. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/8/20163/8/20163/14/2016PPART
DetailsDave Hannah
Continued inspection of safing at slab edge, 2nd floor BSU TI should be complete, followed by 6th Floor of CW TI. Check progress of fire spray patching on 6th floor S/C Columns. Also, Review 1st floor demsing wall at F Line, Electrical has signed off, would like to hang this wall. Notify Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference3/11/20163/11/20163/14/2016PCANC
DetailsDave Hannah
Walk CCP 9 story. Core and Shell Firestop at floor penetrations (restrooms) 8 down. Review of spray hilti application 6th floor. Double check 2 and 3 for shell and core/TI interface. Call Adam. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson core bathrooms floors 2 thru 6 ok for plumbing fire stopping
BLD-Other3/7/20163/7/20163/8/2016PPEND
DetailsDave Hannah
Continued inspection of safing at slab edge, 2nd floor BSU TI. Check thru penetrations covered by column wraps, 3rd floor, NE of Stair 1.Notify Adam when heading to site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference2/25/20163/2/20163/7/2016APEND
DetailsDave Hannah
Adam---###-####
BLD-Framing/Rough-in3/2/20163/2/20163/7/2016PPEND
DetailsDave Hannah
Adam---###-####
BLD-Conference3/2/20163/3/20163/7/2016PPEND
DetailsDave Hannah
City Center - Clearwater, Continued inspection on 5, 4, 3, and possibly 2. Check in With CBI on Floor Stop assembly. Call Adam when on site, ###-####. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Other3/4/20163/4/20163/7/2016PPEND
DetailsDave Hannah
Ongoing inspection of Clearwater. Fire Stop assembly at Slab edge. Verification of fire patching on structural columns. Ongoing job walk, followed by inspection to respective TI''s, Call Adam, ###-####, Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference2/29/20163/1/20163/3/2016PPEND
DetailsDave Hannah
Adam-as per Adam inspection doens''t have anything to do with the plan mod thats in review Phone #: ###-####
BLD-Conference2/25/20162/26/20163/3/2016ADONE
DetailsDave Hannah
Adam--- ###-####
BLD-Conference2/24/20162/25/20162/26/2016PDONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference12/22/201512/22/201512/23/2015PDONE
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Other10/14/201510/14/201510/15/2015PPASS
DetailsDave Hannah
Framing infill at block 22, requested by Adam. call when on site, ###-####. Thanks. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in10/5/201510/5/201510/7/2015PPART
DetailsDave Hannah
adam - call prior - clearwater - arena firewall Phone #: ###-#### ok to start
BLD-Framing/Rough-in9/24/20159/24/20159/24/2015PPART
DetailsJim Sly
contact first - adam Phone #: ###-####
Ext walls 4 line grids J- G 5 .....3rd flr thru 5th.
BLD-Framing/Rough-in9/10/20159/11/20159/11/2015APART
DetailsPhil Shearer
Adam - Call prior to meet - Framing inspection, Metal Stud welding verification Phone #: ###-####. Stud welding east side grid L - J and stiff clips north side floors 4-8 grid 2-4
BLD-Framing/Rough-in9/3/20159/4/20159/4/2015PPEND
DetailsDave Hannah
adam - east elevation Phone #: ###-####
BLD-Framing/Rough-in9/1/20159/1/20159/2/2015PNR
DetailsDave Hannah
Adam - structural walk, Exterior framing, and interior shaft walls Phone #: ###-####
BLD-Conference8/9/20168/9/2016 A 
Details
Inspection walk with adam. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/30/20166/30/2016 P 
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference6/27/20166/27/2016 P 
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Conference5/25/20165/26/2016 P 
DetailsDave Hannah
Shell and Core restrooms 2,3,4,5,6,8 ready for ceiling cover. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference5/24/20165/24/2016 P 
DetailsDave Hannah
Mech has approved CW Shell and Core Restrooms, 2, 3, 4, 5, 6. Ready for cover. Check assembly at North Wall, Women''s Restroom at 7th Floor. akj.

Call on your way over, we can start at 7 and work down. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson