BLD-Final | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | PASS |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
DOC - Permit Finaled | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Blower Door Test Results | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PASS |
Phil Shearer
|
|
|
4.17
|
BLD-Final | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | FAIL |
Mike Jordan
|
|
|
call for access code - Jim Phone #: ###-####. Needs to provide the required insulation cert. Post the blower door test result or provide the 3rd. party airseal inspection reoprt. Correction notice posted.
|
BLD-Energy code compliance | 1/8/2015 | 1/9/2015 | 1/9/2015 | P | PASS |
Mike Jordan
|
|
|
insulation// jim Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2015 | 1/9/2015 | 1/9/2015 | P | PASS |
Mike Jordan
|
|
|
call from Jim to change from am to pm // Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 1/7/2015 | 1/8/2015 | 1/8/2015 | A | FAIL |
Mike Jordan
|
|
|
Jim Phone #: ###-####. Complete lateral bracing on A6, A9, E5, E6, and E7 trusses. Roll block E5, E6, E7, D3 and D4 trusses. Complete nailing of hold down at garage. Provide hot dipped galvanized nails into sole plate. remainder of wall bracing ok. ok to insulate. Correction notice posted.
|
BLD-Foundation | 12/4/2014 | 12/4/2014 | 12/4/2014 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Foundation | 12/3/2014 | 12/4/2014 | 12/4/2014 | A | NR |
Mike Jordan
|
|
|
around 11 if possible// aldaro Phone #: ###-####
|
BLD-Footing | 12/3/2014 | 12/3/2014 | 12/3/2014 | P | PART |
Mike Jordan
|
|
|
Pouring at 1 - Wes Phone #: ###-####. Work in progress
|