BLD-Final | 5/29/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Jim Sly
|
|
|
Gracey Phone #: ###-#### Previously passed by Phil Shearer.
|
DOC - Permit Finaled | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | PASS |
Phil Shearer
|
|
|
Justin Phone #: ###-####
|
DOC - Permit Finaled | 7/16/2015 | 7/16/2015 | 7/16/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 7/14/2015 | 7/15/2015 | 7/15/2015 | P | FAIL |
Phil Shearer
|
|
|
Justin Phone #: ###-####. Windows in front room are within 18" of the floor and need to be tempered.
|
BLD-Other | 7/2/2015 | 7/2/2015 | 7/2/2015 | P | CANC |
Phil Shearer
|
|
|
|
BLD-Wall cover | 5/30/2015 | 6/1/2015 | 6/1/2015 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Hubble
|
BLD-Framing/Rough-in | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Hubble
|
BLD-Wall Bracing | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Hubble
|
BLD-Framing/Rough-in | 5/25/2015 | 5/26/2015 | 5/26/2015 | A | FAIL |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Hubble. No truss Engineering docs onsite and plans are missing pages.
|
BLD-Wall Bracing | 4/7/2015 | 4/8/2015 | 4/8/2015 | P | PART |
Phil Shearer
|
|
|
Shear // Macen Phone #: ###-####. Missing 6 hold downs and interior shear wall OK to wrap.
|
BLD-Foundation | 2/12/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|