BLD-Final | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PASS |
Phil Shearer
|
|
|
Kevin Phone #: ###-####
|
DOC - Permit Finaled | | | 10/9/2015 | | DONE |
|
|
|
per Final inspection 10-9-15
|
FIRE-Final Inspection | 10/7/2015 | 10/8/2015 | 10/8/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 10/6/2015 | 10/7/2015 | 10/7/2015 | A | NR |
Phil Shearer
|
|
|
Kevin Phone #: ###-####
|
FIRE-Final Inspection | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PART |
Troy Cobbley
|
|
|
Life safety will be ok to pass when BLD14-03468 is signed off.
|
FIRE-Final Inspection | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | FAIL |
Troy Cobbley
|
|
|
Need shell core finaled, need hardware between office and warehouse either reversed or changed to passage, need exit discharge light at north end of building repaired.
|
BLD-Foundation | 9/2/2015 | 9/3/2015 | 9/3/2015 | A | CANC |
Phil Shearer
|
|
|
Kevin-re-bar (T) Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 9/3/2015 | 9/3/2015 | 9/3/2015 | P | PASS |
Phil Shearer
|
|
|
Kevin-re-bar (T) Phone #: ###-####
|
BLD-Energy code compliance | 8/10/2015 | 8/11/2015 | 8/11/2015 | A | PASS |
Phil Shearer
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2015 | 8/3/2015 | 8/3/2015 | A | PASS |
Phil Shearer
|
|
|
Kevin Phone #: ###-####
|