BLD-Final | 2/26/2015 | 2/27/2015 | 2/27/2015 | P | PASS |
Jim Storey
|
|
|
Thanks Matt, Phone #: ###-#### Inspection requested via web by Richard Schultz
|
FIRE-Final Inspection | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PASS |
Forrest France
|
|
|
Life safety inspection passed provided "door to remain unlocked....." signage is posted at the main entry/exit as required.
|
FIRE-Final Inspection | 2/26/2015 | 2/26/2015 | 2/27/2015 | P | DEFR |
Forrest France
|
|
|
rescheduled 2/27 AM
|
BLD-Ceiling Grid Inspection | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | PART |
Jim Storey
|
|
|
Thanks Matt, Phone #: ###-#### Inspection requested via web by Richard Schultz grid ok mec and ele pending insp.
|
BLD-Framing/Rough-in | 1/28/2015 | 1/29/2015 | 1/29/2015 | A | PASS |
Jim Storey
|
|
|
Thanks Matt, Phone #: ###-#### Inspection requested via web by Richard Schultz per the aproved plan
|