BLD-Final | 9/1/2015 | 9/2/2015 | 9/2/2015 | A | PASS |
Jim Sly
|
|
|
Rob Phone #: ###-####,,, 3600 Pass Per 415
|
DOC - Permit Finaled | 9/2/2015 | 9/2/2015 | 9/2/2015 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 8/31/2015 | 9/1/2015 | 9/1/2015 | P | PEND |
Tony Young
|
|
|
Rob Phone #: ###-####,, ok pending mechanical final
|
BLD-Final | 8/31/2015 | 8/31/2015 | 9/1/2015 | P | NR |
Tony Young
|
|
|
Rob Phone #: ###-####
|
BLD-Framing/Rough-in | 4/15/2015 | 4/15/2015 | 4/15/2015 | P | PASS |
Jim Sly
|
|
|
Rob Phone #: ###-#### Energy ......ok
|
BLD-Framing/Rough-in | 4/10/2015 | 4/13/2015 | 4/13/2015 | A | FAIL |
Tony Young
|
|
|
Rob Phone #: ###-####,, correction posted on truss engineering page,, need to fix truss bracing issues,, strap the top plate above the fireplace,, add blocking at truss bearing locations per structural engineering,, add OSB brace panels or justify on interior walls,, etc. (can insulate walls if needed)
|
BLD-Wall Bracing | 4/1/2015 | 4/3/2015 | 4/3/2015 | A | PASS |
Tony Young
|
|
|
Per Shane Phone #: ###-####
|
BLD-Wall Bracing | 4/1/2015 | 4/1/2015 | 4/1/2015 | P | NR |
Tony Young
|
|
|
Shane Phone #: ###-####,, need portal frame
|
BLD-Foundation | 3/16/2015 | 3/17/2015 | 3/17/2015 | A | PART |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 3/16/2015 | 3/16/2015 | 3/16/2015 | P | PART |
Tony Young
|
|
|
Dane Phone #: ###-####,, work in progress
|
BLD-Footing | 3/13/2015 | 3/16/2015 | 3/16/2015 | A | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|