(ROCKY MOUNTAIN MANAGEMENT AND DEVELOPMENT LLC)(JEFFERSON PLACE)(SUITE 200)(See upgrade for type of construction chage)(This permit has fire sprinkler and fire alarm upgrade agreements)**Fire sprinklers used for additional story increase. Minor renovation to existing 4,262 sq ft office space. No changes to the exterior of the building are proposed. Previous renovation under BLD95-001032. Scope of work to include minor demo of existing partitions and construction of new nonbearing partitions to reconfigure offices, new finishes throughout. Interior finish shall meet the requirements of IBC chapter 8. Existing lighting and HVAC to remain and shift if/as needed. Minor electrical to accommodate partition changes. Upgrade work to existing fire alarm system for this suite. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/13/20161/13/20161/13/2016PPASS
DetailsDave Hannah
Ross Phone #: ###-####
FIRE-Final Inspection1/13/20161/13/20161/13/2016PPASS
DetailsJim Page
Fire alarm panel upgrade installation complete, fire sprinkler inspection complete, fire alarm inspection complete. Life fire safety passed/complete.
BLD-Aging Inspection1/6/20161/6/20161/6/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection9/15/20159/15/20159/21/2015 PEND
DetailsDave Hannah
BLD-Final7/13/20157/13/20157/13/2015APART
DetailsDave Hannah
Tom Phone #: ###-#### ok for temp occ
FIRE-Final Inspection7/13/20157/13/20157/13/2015PPART
DetailsTroy Cobbley
A temporary occupancy for fire life safety was given with scott and jennifer's permission until the building fire alarm system has been upgraded through the new upgrade agreement. Life safety including fire alarm is complete for this suite.
BLD-Final7/10/20157/10/20157/13/2015PPEND
DetailsDave Hannah
Tom Phone #: ###-#### per scott ok to move in furnature but still needs alarm sign off
FIRE-Final Inspection7/10/20157/10/20157/10/2015PPART
DetailsJim Page
Authorized only for furniture moving/office setup per conversation with Scott Arellano. Life safety complete, still need to test fire alarm horns/strobes associated with FIR permit for this project. Will be scheduled at later date.
BLD-Final7/9/20157/10/20157/10/2015ANR
DetailsDave Hannah
Tom Phone #: ###-#### needs plumbing and fire finals
BLD-Ceiling Grid Inspection6/24/20156/25/20156/25/2015APASS
DetailsDave Hannah
Tom Phone #: ###-####
BLD-Framing/Rough-in3/23/20153/24/20153/24/2015APASS
DetailsDave Hannah
Gus Phone #: ###-####
BLD-Framing/Rough-in3/23/20153/23/20153/23/2015PPART
DetailsDave Hannah
Gus Phone #: ###-#### ok to one side walls needs to remove screws from ceiling grid
BLD-Conference3/11/20153/12/20153/12/2015PPEND
DetailsDave Hannah
Guss Phone #: ###-####