BLD-Final | 10/19/2015 | 10/20/2015 | 10/20/2015 | A | PASS |
Dave Hannah
|
|
|
Craig Phone #: ###-####
|
BLD-Final | 10/2/2015 | 10/5/2015 | 10/5/2015 | P | FAIL |
Dave Hannah
|
|
|
Ross Phone #: ###-#### needs code complant door hardwear on ed room
|
FIRE-Final Inspection | 10/2/2015 | 10/5/2015 | 10/5/2015 | A | PASS |
Jim Page
|
|
|
Life fire safety passed/complete
|
FIRE-Final Inspection | 10/2/2015 | 10/5/2015 | 10/5/2015 | P | CANC |
Jim Page
|
|
|
Ross Phone #: ###-####
|
BLD-Conference | 9/10/2015 | 9/10/2015 | 9/10/2015 | P | CANC |
Tony Young
|
|
|
Craig Phone #: ###-####
|
BLD-Conference | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PART |
Tony Young
|
|
|
Craig Phone #: ###-####,, ?s about animal sink,, ok
|
BLD-Final | 8/10/2015 | 8/11/2015 | 8/11/2015 | P | PART |
Dave Hannah
|
|
|
Ross Phone #: ###-#### ok to occ phase one and start on phase two
|
FIRE-Final Inspection | 8/7/2015 | 8/11/2015 | 8/11/2015 | P | PART |
Katie Marron
|
|
|
Life Safety pass for new Gift Shop area so that gift shop can be relocated and renovations completed in existing gift shop, under this permit.
Correction notice item:address number to be posted.
|
BLD-Framing/Rough-in | 6/26/2015 | 6/29/2015 | 6/30/2015 | P | PASS |
Dave Hannah
|
|
|
Boise Zoo Phone #: ###-####
|
BLD-Framing/Rough-in | 6/2/2015 | 6/3/2015 | 6/3/2015 | A | PART |
Dave Hannah
|
|
|
Ross Phone #: ###-#### ok to cover roof and ext of new addition
|
BLD-Foundation | 5/11/2015 | 5/12/2015 | 5/12/2015 | A | PASS |
Dave Hannah
|
|
|
Ross-stem wall Phone #: ###-####
|
BLD-Footing | 5/8/2015 | 5/11/2015 | 5/12/2015 | P | PASS |
Dave Hannah
|
|
|
Ross Phone #: ###-####
|