BLD-Final | 6/17/2015 | 6/18/2015 | 6/18/2015 | A | PASS |
Mike Jordan
|
|
|
Dale Phone #: ###-####
|
DOC - Permit Finaled | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Foundation | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | PART |
Mike Jordan
|
|
|
Dale Phone #: ###-####. Work in progress for retaining wall, special inspector on site. Also issued a orrection notice stating that per IBC Sec. 1009.15, handrails are required on both sides of stairways, approved plan only showed one handrail.
|
BLD-Footing | 6/10/2015 | 6/10/2015 | 6/10/2015 | P | PART |
Mike Jordan
|
|
|
Dale-would like insp after 10 if possible Phone #: ###-####. Work in progress on footing for new exteior stairs at loading dock. Will have special inspection.
|
BLD-Footing | 6/9/2015 | 6/10/2015 | 6/10/2015 | A | CANC |
Mike Jordan
|
|
|
Dale-would like insp after 10 if possible Phone #: ###-####. Moved to pm inspection.
|