BLD-Final | 10/26/2015 | 10/27/2015 | 10/27/2015 | A | PASS |
Jim Sly
|
|
|
Tyler Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 10/15/2015 | 10/16/2015 | 10/16/2015 | P | PART |
Mike Jordan
|
|
|
Tyler Phone #: ###-####. Ok for temp occ.
|
FIRE-Final Inspection | 10/8/2015 | 10/9/2015 | 10/9/2015 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Energy code compliance | 8/19/2015 | 8/19/2015 | 8/20/2015 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Framing/Rough-in | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Jim Sly
|
|
|
Please come as early as possible Phone #: ###-#### Inspection requested via web by Tyler Hildebrand Frame and Energy Pass.
|
BLD-Framing/Rough-in | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | DEFR |
Jim Storey
|
|
|
Please come as early as possible Phone #: ###-#### Inspection requested via web by Tyler Hildebrand out of time
|
BLD-Wall Bracing | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Jim Sly
|
|
|
ext shear Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Wall Bracing | 7/7/2015 | 7/8/2015 | 7/8/2015 | A | PASS |
Jim Sly
|
|
|
2nd floor interior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
|
BLD-Energy code compliance | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Jim Storey
|
|
|
Rob Phone #: ###-#### foam at stem wall.
|
BLD-Foundation | 6/4/2015 | 6/4/2015 | 6/4/2015 | P | PASS |
Mike Jordan
|
|
|
Manuel Phone #: ###-####
|
BLD-Footing | 6/3/2015 | 6/3/2015 | 6/3/2015 | P | PASS |
Jim Sly
|
|
|
Manual Phone #: ###-####
|