BLD-Final | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | PASS |
Jim Storey
|
|
|
Front door unlocked Inspection requested via web by Erby Gonzales
|
DOC - Permit Finaled | 8/17/2015 | 8/17/2015 | 8/17/2015 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Phil Shearer
|
|
|
Inspection requested via web by Erby Gonzales
|
BLD-Framing/Rough-in | 6/8/2015 | 6/8/2015 | 6/8/2015 | P | PASS |
Phil Shearer
|
|
|
Inspection requested via web by Erby Gonzales
|
BLD-Framing/Rough-in | 6/4/2015 | 6/4/2015 | 6/4/2015 | P | PART |
Phil Shearer
|
|
|
Plans on site at fireplace Inspection requested via web by Erby Gonzales. Missing truss bracind on D3 OK to insulate.
|
BLD-Conference | 5/26/2015 | 5/26/2015 | 5/26/2015 | A | DONE |
Phil Shearer
|
|
|
Shear inspection, plans on site Inspection requested via web by Erby Gonzales
|
BLD-Wall Bracing | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Phil Shearer
|
|
|
Shear inspection, plans on site Inspection requested via web by Erby Gonzales
|
BLD-Wall Bracing | 5/22/2015 | 5/22/2015 | 5/22/2015 | P | FAIL |
Phil Shearer
|
|
|
Shear inspection, rescheduled for PM. Plans on site Inspection requested via web by Erby Gonzales. replace sheeting on portal framethe nails are over shot. All s1 shear panels need to have 8D at 6" and 12" or staples at 3" and 6" CN posted
|
BLD-Wall Bracing | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | CANC |
Phil Shearer
|
|
|
Shear inspection, plans on site >> Inspection requested via web by Erby Gonzales Inspection cancelled from web by: Erby Gonzales
|
BLD-Foundation | 4/20/2015 | 4/21/2015 | 4/21/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | PASS |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 4/16/2015 | 4/17/2015 | 4/17/2015 | P | NR |
Jim Storey
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|