BLD-Final | 8/5/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Phil Shearer
|
|
|
Dean Phone #: ###-####; call ahead for access
|
DOC - Permit Finaled | 8/5/2015 | 8/5/2015 | 8/5/2015 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 8/3/2015 | 8/4/2015 | 8/4/2015 | A | FAIL |
Phil Shearer
|
|
|
Windows in master are less then 18" above floor and need to be tempered. step between house and the garage is greater then 7 3/4"
|
BLD-Framing/Rough-in | 6/8/2015 | 6/9/2015 | 6/9/2015 | A | PASS |
Phil Shearer
|
|
|
Refram and Energy // Dean Phone #: ###-####
|
BLD-Energy code compliance | 6/9/2015 | 6/9/2015 | 6/9/2015 | P | PASS |
Phil Shearer
|
|
|
Refram and Energy // Dean Phone #: ###-####
|
BLD-Framing/Rough-in | 6/5/2015 | 6/5/2015 | 6/5/2015 | P | PART |
Phil Shearer
|
|
|
Dean Phone #: ###-####. Missing truss bracing on D4 provide engineered fix on cut floor joist
|
BLD-Wall Bracing | 5/19/2015 | 5/20/2015 | 5/20/2015 | P | PASS |
Phil Shearer
|
|
|
Dean Phone #: ###-####
|
BLD-Foundation | 4/27/2015 | 4/28/2015 | 4/28/2015 | P | PASS |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 4/27/2015 | 4/27/2015 | 4/28/2015 | P | PART |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 4/23/2015 | 4/23/2015 | 4/23/2015 | P | PART |
Phil Shearer
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|
BLD-Footing | 4/22/2015 | 4/22/2015 | 4/23/2015 | P | CANC |
Phil Shearer
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|