Permit Information
Permit NumberBLD15-01117
StatusFinaled
Name BACH LAND AND DEVELOPMENT LLC
Site Address 7776 W SAXTON DR
Project NameThe Kensington Apartments W
Customer NumberBLD15-01107 IN EPLAN
ePlanReview 
Description
(THE KENSINGTON APARTMENTS - BUILDING W) The drawings for site work (civil, landscaping, lawn sprinklers, site electrical, site plumbing, etc.) are filed under BLD15-01107 in ePlanReview. The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 42,997 square foot four story apartment building (10,993 sq. ft. 1st story with four 2.a units and four 3.a units, 10,993 sq. ft. 2nd story with four 2.a units and four 3.a units, 10,993 sq. ft. 3rd story with four 2.a units and four 3.a units, and 10,018 sq. ft. 4th story with four 2.a units and four 2.b units). All ground floor units are required to comply as Type B dwelling units. No elevator is provided in this building. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, fiber-cement board siding, manufactured stone veneer, 1-hr dwelling unit separations, .5-hr minimum fire-resistance-rated corridors with 20 minute smoke- and draft-control doors, exterior exit stairways fire rated like the corridors, steel stairways with concrete treads, interior nonbearing walls, millwork, and finishes. Special Inspection is required for soils and for concrete. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/17/20175/17/20175/17/2017PPASS
DetailsJim Sly
Ed-for final occ (have temp c of o0 Phone #: ###-####
Public works does not want to sign off til the end of project.....ACHD as well.
BLD-Final5/10/20175/11/20175/11/2017ANH
DetailsJim Sly
Barry-bldg W Phone #: ###-####
Called Barry.......Covering for Tony, Don't know Exactly where Bldg W is. Barry didn't answer his phone and does not have Voice mail. Public Works has not finaled.....He is on Temp per Tony. Still needs all stairs checked out. I found 1 rise of almost 8". No one ever called me back. Need to re-call for final.
BLD-Final5/4/20175/5/20175/5/2017PPART
DetailsTony Young
Ed Phone #: ###-####,, temp occ ok,, need to fine tune stair rises
FIRE-Final Inspection5/4/20175/4/20175/4/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, knox box is in place, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete
BLD-Framing/Rough-in2/20/20172/21/20172/21/2017APASS
DetailsTony Young
First floor Framing Inspection Phone #: ###-#### Inspection requested via web by Barry Willoughby,, drops ok
BLD-Framing/Rough-in2/9/20172/9/20172/9/2017PPART
DetailsTony Young
2nd floor south tower // Ed Phone #: ###-####,, drops ok to cover
BLD-Framing/Rough-in2/1/20172/1/20172/1/2017PPASS
DetailsTony Young
s tower - 3rd fl - ED Phone #: ###-####,, drops ok
BLD-Framing/Rough-in1/31/20171/31/20171/31/2017PPASS
DetailsJim Sly
3rd Floor north tower // Ed Phone #: ###-####
BLD-Energy code compliance1/24/20171/25/20171/25/2017APASS
DetailsTony Young
1st & 2nd floor - Ed Phone #: ###-####
BLD-Energy code compliance1/20/20171/20/20171/20/2017PPASS
DetailsTony Young
Ed// 2nd floor Phone #: ###-####
BLD-Energy code compliance1/17/20171/18/20171/20/2017APASS
DetailsTony Young
Ed-3rd floor Phone #: ###-####
BLD-Framing/Rough-in1/17/20171/18/20171/20/2017APASS
DetailsTony Young
Ed-1st and 2nd floors Phone #: ###-####
BLD-Framing/Rough-in1/17/20171/17/20171/17/2017PDEFR
DetailsTony Young
Ed-1st and 2nd floors Phone #: ###-####
BLD-Energy code compliance1/17/20171/17/20171/17/2017PDEFR
DetailsTony Young
Ed-3rd floor Phone #: ###-####,, out of time
BLD-Framing/Rough-in1/12/20171/13/20171/13/2017APART
DetailsTony Young
3rd floor - Ed Phone #: ###-####,, 3rd floor ok pending mech and adding studsunder girders,, pre rock ok for trades
BLD-Energy code compliance12/20/201612/20/201612/20/2016PPART
DetailsTony Young
Ed Phone #: ###-####,, 4th floor ok to cover
BLD-Framing/Rough-in12/13/201612/14/201612/14/2016APART
DetailsTony Young
Ed// 4th floor Phone #: ###-####,, ok to insulate walls,, need fire passed prior to cover
BLD-Energy code compliance9/22/20169/22/20169/22/2016PPASS
DetailsPhil Shearer
Ed-plumbing walls Phone #: ###-####
BLD-Wall Bracing9/20/20169/20/20169/20/2016PPART
DetailsTony Young
Inside shear // Ed Phone #: ###-####,, plumbing walls only,, ok
BLD-Wall Bracing9/8/20169/9/20169/14/2016PPASS
DetailsTony Young
Ed Phone #: ###-####
BLD-Wall Bracing9/8/20169/8/20169/8/2016PPART
DetailsTony Young
Ed Phone #: ###-####,, marked areas to go back over and re-nail
BLD-Wall Bracing9/6/20169/7/20169/8/2016APART
DetailsTony Young
Ed Phone #: ###-####,, work in progress
BLD-Framing/Rough-in9/6/20169/6/20169/6/2016PCANC
DetailsTony Young
Ed Phone #: ###-####,, wanted wall bracing,, deffered to am,, out of time
BLD-Footing5/16/20165/17/20165/17/2016APART
DetailsJim Sly
Ed Phone #: ###-####
BLD-Footing5/6/20165/9/20165/9/2016APEND
DetailsTony Young
Ed Phone #: ###-####,, pending special inspection