(IDAHO POWER)(M&E SHOP) Additional address 10792 W. Franklin. Permit to construct new 20' x 14' material prep room and alterations to existing 17'X12' wash bay in existing shop space. Prep room to include new double doors, lighting, mechanical equipment, and convenience receptacles. Construct new hard lid ceiling over existing wash bay and install new lighting and mechanical to serve enclosed space. Other mechanical work in area as shown on approved plans and new roof top unit, see engineers letter on structural placement of equipment. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/23/20162/24/20162/24/2016APASS
DetailsMike Jordan
Please call 30min ahead for access - Jason Phone #: ###-####
DOC - Permit Finaled2/24/20162/24/20162/24/2016PPASS
DetailsMike Jordan
FIRE-Final Inspection2/23/20162/23/20162/23/2016PPASS
DetailsJim Page
No fire sprinklers, fire alarm inspection complete, fire extinguishers have current inspection tags. Life fire safety inspection passed/complete.
BLD-Final10/23/201510/26/201510/26/2015PNR
DetailsMike Jordan
Call half hour before // Shaun Phone #: ###-####. Still has life/safety issues.
FIRE-Final Inspection10/23/201510/26/201510/26/2015ACANC
DetailsTroy Cobbley
Per Shaun the fire alarm notification issue has not been resolved
FIRE-Final Inspection10/9/201510/9/201510/9/2015PNR
DetailsTroy Cobbley
Project related fire alarm permit/work has not been performed. I noted that it appears notification work may be required.
BLD-Final10/7/201510/7/201510/7/2015PNR
DetailsMike Jordan
Shawn// please call 30 min prior Phone #: ###-####. needs fire/life/safety final.
BLD-Framing/Rough-in9/3/20159/4/20159/4/2015PPASS
DetailsMike Jordan
Call half hour before // Jason Phone #: ###-####. Framing at existing washbay ok.
BLD-Framing/Rough-in8/21/20158/24/20158/24/2015PPASS
DetailsMike Jordan
Jason// please call before Phone #: ###-####. Interior steel stud framed walls and ceiling for sand blasting room ok.