BLD-Final | 4/4/2016 | 4/4/2016 | 4/4/2016 | P | CANC |
Mike Jordan
|
|
|
pool final Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
BLD-Final | 4/4/2016 | 4/4/2016 | 4/4/2016 | P | PASS |
Mike Jordan
|
|
|
pool final Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
|
DOC - Permit Finaled | 4/4/2016 | 4/4/2016 | 4/4/2016 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 4/1/2016 | 4/1/2016 | 4/1/2016 | P | FAIL |
Jim Storey
|
|
|
Please call before going out. So I can meet you there, im 5 minutes away. ###-#### Phone #: ###-#### Inspection requested via web by Tyler Hildebrand no plans on site west gate not self closing
|
FIRE-Final Inspection | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | PASS |
Jim Page
|
|
|
Life fire safety inspection for pool area passed/complete
|
BLD-Final | 3/31/2016 | 4/1/2016 | 4/1/2016 | A | NR |
Jim Sly
|
|
|
Pool Final- Please call before heading over, I will meet with plans. Phone #: ###-#### Inspection requested via web by Tyler Hildebrand Need Fire Final.
|
FIRE-Final Inspection | 11/13/2015 | 11/13/2015 | 11/13/2015 | P | FAIL |
Troy Cobbley
|
|
|
Stopped at job site twice and the property manager was not here to provide access. No inspection performed.
|
BLD-Final | 11/2/2015 | 11/3/2015 | 11/3/2015 | A | NR |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Needs other trades finals, fire/life/safety and zoning finals.
|
BLD-Foundation | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PASS |
Mike Jordan
|
|
|
Rebar pool // Mark Phone #: ###-####
|