BLD-Framing/Rough-in | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Jim Sly
|
|
|
TWAIN Phone #: ###-####
|
BLD-Wall cover | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | PART |
Jim Sly
|
|
|
Twayne Phone #: ###-#### Exterior shear nailing only............OK.
|
BLD-Framing/Rough-in | 12/18/2017 | 12/18/2017 | 12/18/2017 | P | NR |
Jim Sly
|
|
|
Twaine Phone #: ###-#### Need stamped Engineering for fixes.
|
BLD-Final | 11/29/2017 | 11/30/2017 | 11/30/2017 | P | NR |
Jim Sly
|
|
|
Call to meet // Dwayne Phone #: ###-####
|
BLD-Framing/Rough-in | 10/23/2017 | 10/24/2017 | 10/24/2017 | A | PART |
Jim Sly
|
|
|
As early as possible // Twayne Phone #: ###-#### Should be a Shear Inspection. Not per approved plan. Structural Engineer to Review changes,......approve ....or provide fix.
|
BLD-Wall Bracing | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PART |
Jim Sly
|
|
|
upstairs Shear... Call // Twain Phone #: ###-#### 2nd floor shear nailing OK. 2nd floor framing OK.
|
BLD-Wall Bracing | 9/26/2017 | 9/27/2017 | 9/28/2017 | P | NR |
Jim Sly
|
|
|
Requesting 3PM, call ahead for access - Twayne Phone #: ###-#### Need Engineering.
|
BLD-Footing | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PART |
Jim Sly
|
|
|
Terry Phone #: ###-#### This should have been a foundation wall inspection..........Pass.
|
BLD-Footing | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | PASS |
Jim Sly
|
|
|
Terry-shop Phone #: ###-####
|