BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PASS |
Mike Jordan
|
|
|
Requested by John Saucerman. Phone #: ###-#### Inspection requested via web by Shane Treasure
|
DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 | P | PASS |
Mike Jordan
|
|
|
Hanrails repaired.
|
BLD-Final | 9/5/2015 | 9/8/2015 | 9/8/2015 | P | FAIL |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by John Saucerman.Handrails on stairs
|
FIRE-Final Inspection | 9/5/2015 | 9/8/2015 | 9/8/2015 | A | PASS |
Troy Cobbley
|
|
|
Fire/Safety passed
|
BLD-Final | 9/3/2015 | 9/4/2015 | 9/3/2015 | P | CANC |
Phil Shearer
|
|
|
Requested by John Saucerman Phone #: ###-#### >> Inspection requested via web by Shane Treasure Inspection cancelled from web by: Shane Treasure
|
FIRE-Final Inspection | 9/3/2015 | 9/4/2015 | 9/3/2015 | A | CANC |
Troy Cobbley
|
|
|
Fire/life safety final for john Saucerman Phone #: ###-#### >> Inspection requested via web by Shane Treasure Inspection cancelled from web by: Shane Treasure
|
BLD-Final | 8/31/2015 | 9/1/2015 | 9/1/2015 | P | CANC |
Phil Shearer
|
|
|
John Phone #: ###-####
|
FIRE-Final Inspection | 8/31/2015 | 9/1/2015 | 9/1/2015 | A | FAIL |
Troy Cobbley
|
|
|
Provide correct door hardware on the Waiting Room/Showroom exit doors as discussed. This would be keyed with sticker on one of them and the other would need single action. All other items appear ok.
|
BLD-Final | 8/28/2015 | 8/31/2015 | 8/31/2015 | P | NR |
Jim Sly
|
|
|
This is for fire-life and final Phone #: ###-#### Inspection requested via web by John Saucerman Need Fire /Life safety final.
|
BLD-Conference | 7/23/2015 | 7/24/2015 | 7/24/2015 | A | DONE |
Phil Shearer
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by John Saucerman
|
BLD-Framing/Rough-in | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Phil Shearer
|
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by John Saucerman
|
BLD-Framing/Rough-in | 6/4/2015 | 6/5/2015 | 6/5/2015 | A | PART |
Phil Shearer
|
|
|
framing for phase 1 restroom. Phone #: ###-#### Inspection requested via web by John Saucerman
|