FIRE-Final Inspection | 10/26/2015 | 10/27/2015 | 10/26/2015 | A | PASS |
Jim Page
|
|
|
Previously noted items on fire sprinkler system addressed/repaired, life fire safety passed/complete
|
BLD-Final | 10/16/2015 | 10/19/2015 | 10/19/2015 | A | PASS |
Jim Storey
|
|
|
Ron Phone #: ###-#### mec 15-03950 stand alone permit final ok on bld.
|
BLD-Final | 9/28/2015 | 9/29/2015 | 9/29/2015 | A | PASS |
Jim Storey
|
|
|
Temp C of O // Ron Phone #: ###-#### final ok pending others.
|
FIRE-Final Inspection | 9/24/2015 | 9/25/2015 | 9/25/2015 | A | PART |
Jim Page
|
|
|
Partial final for life fire safety passed/complete, per converstaion with Scott Arellano a 30 day TCO authorized. Fire sprinkler heads to be added under processing equipment, once fire sprinkler heads are installed/inspected then Building Permit can be finaled.
|
BLD-Footing | 6/23/2015 | 6/24/2015 | 6/24/2015 | A | PASS |
Jim Storey
|
|
|
Dave Phone #: ###-####
|
BLD-Foundation | 6/18/2015 | 6/18/2015 | 6/18/2015 | P | PASS |
Jim Storey
|
|
|
Ron Phone #: ###-####
|