Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-01721
StatusFinaled
Name ESI
Site Address 777 W MAIN ST Unit: 170
Project NameValley Regional Transit
Customer Number 
ePlanReviewYes
Description
(VALLEY REGIONAL TRANSIT – MAIN STREET STATION – CITY CENTER PLAZA BASEMENT) To construct a Multi-Modal Transit Center in the basement of the new City Center Plaza building. The space will include offices, public waiting areas, and bus circulation. The total basement area, not including the bus ramps, is about 45,978 square feet. Work is to include interior nonbearing walls, 2 public multiple fixture restrooms accessible to the disabled, 2 single user employee restrooms accessible to the disabled, interior doors, interior windows, suspended acoustical ceilings, benches, service windows, and finishes. The office, waiting, and restroom areas are conditioned where the bus circulation and platform areas are not condition. A thermal envelope that complies with the energy code is required between conditioned and unconditioned areas. Special Inspection is required for welding. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/16/201611/16/201611/16/2016APASS
DetailsDave Hannah
Ok for permanent occupancy once bond is posted.
FIRE-Final Inspection11/14/201611/14/201611/14/2016PPASS
DetailsJim Page
Final inspection complete
BLD-Final10/10/201610/10/201610/11/2016PPART
DetailsDave Hannah
On track for temp C of O for VRT TI. Call Adam when on site. Thanks. AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson ok for tco
FIRE-Final Inspection10/10/201610/10/201610/10/2016PPART
DetailsJim Page
Partial final for life fire safety inspection complete, final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Partial final inspection for VRT complete, permit will not be finaled until core and shell for city center plaza is completed. VRT can be finaled for life fire safety pending core and shell permit completion.
BLD-Final10/7/201610/7/201610/10/2016PPEND
DetailsDave Hannah
Mechanical final will be performed in the am, seeking C of O allowing tenat to set up for occupancy. Call adam when on site. Thanks akj Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Final Inspection10/7/201610/7/201610/7/2016PCANC
DetailsJim Page
Inspection request is going to be rescheduled per conversation with point of contact, Adam phone number ###-####
BLD-Final9/29/20169/29/20169/30/2016PPART
DetailsDave Hannah
Per recap from yesterdays walk thru, review and sign card for approval on temp use for testing and training. Call Adam when on site. Thanks AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok for training
FIRE-Final Inspection9/29/20169/29/20169/29/2016PPART
DetailsJim Page
Partial final life fire safety inspection complete, fire sprinklers are complete with exception to various escutcheons, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags.
BLD-Final9/27/20169/28/20169/29/2016PCANC
DetailsDave Hannah
Requesting inspection to review VRT TI space. Call Adam when on site. ###-####. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Conference9/28/20169/28/20169/28/2016PDONE
DetailsJim Page
Fire conference complete, items needed for life fire safety inspection reviewed.
FIRE-Final Inspection9/27/20169/28/20169/28/2016PCANC
DetailsJim Page
Inspection request was for a fire conference, project is not ready for life fire safety final.
BLD-Ceiling Grid Inspection9/12/20169/12/20169/13/2016PPASS
DetailsDave Hannah
Begin inspections of OH ceilings, west side, north drive isle, and stair vestibule and ticket areas. Please call Adam when heading to site. Thanks AKJ. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference9/9/20169/9/20169/12/2016PPEND
DetailsDave Hannah
Adam Phone #: ###-####
BLD-Framing/Rough-in8/22/20168/22/20168/22/2016APASS
DetailsDave Hannah
Restroom. Hard lid framing approve for cover. Call Adam when on site. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in7/20/20167/21/20167/21/2016APART
DetailsDave Hannah
Interior VRT TI Wall Rough ins complete, electrical signed off. Ready for framing inspection. akj 7/20/16 AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson ok to cover walls