BLD-Final | 10/28/2015 | 10/29/2015 | 10/29/2015 | A | PASS |
Dave Hannah
|
|
|
Matt// please call for access Phone #: ###-####
|
BLD-Final | 9/2/2015 | 9/4/2015 | 9/4/2015 | A | PART |
Dave Hannah
|
|
|
Gardner Phone #: ###-#### ok for temp occ ok for perm after elec finals
|
FIRE-Final Inspection | 9/2/2015 | 9/3/2015 | 9/3/2015 | P | PASS |
Katie Marron
|
|
|
Fire life safety pass. One 2x2 ceiling tile to be replaced due to hole, facility manager was fixing immediately.
|
FIRE-Final Inspection | 8/25/2015 | 8/25/2015 | 8/25/2015 | P | CANC |
Jim Page
|
|
|
This project still has an FIR permit that has not been finaled, informed POC, Brad phone# ###-####, that the fire alarm inspection needs to be passed/finaled before the life fire safety inspection can be completed.
|
BLD-Final | 8/25/2015 | 8/26/2015 | 8/25/2015 | A | CANC |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|
BLD-Framing/Rough-in | 6/24/2015 | 6/24/2015 | 6/25/2015 | P | PASS |
Dave Hannah
|
|
|
Brad Phone #: ###-####
|