Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-02159
StatusFinaled
Name TBL CONSTRUCTION
Site Address 905 W PUEBLO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(Plan modification Phase 2) As per the attached engineering adding headers, beams, post, floor joist and lateral shear walls at the home and the garage areas, see attached engineering for locations of work, **JG**
(Phase 1) Permit is for lifting of the existing single family dwelling to allow for a new engineered basement retaining concrete walls and footings only, all work to be per the approved plans, current local codes and attached engineering, no other work is permitted under this permit any additional work beyond the scope of work will require a permit. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/27/20174/28/20174/28/2017APASS
DetailsTony Young
Tim,, Phone #: ###-####
DOC - Permit Finaled4/28/20174/28/20174/28/2017PPASS
DetailsTony Young
BLD-Conference4/26/20174/27/20174/27/2017APASS
DetailsTony Young
Tim,, walk through on final; Phone #: ###-####,, work in progress
BLD-Framing/Rough-in4/7/20174/7/20174/7/2017APASS
DetailsDave Hannah
Call Tim if any problems Phone #: ###-#### Inspection requested via web by Timothy Beaudoin garage framing ok to cover
BLD-Framing/Rough-in3/3/20173/3/20173/3/2017PFAIL
DetailsJim Storey
Call Tim if any issues Phone #: ###-#### Inspection requested via web by Timothy Beaudoin no plans/no truss engineering/ ele drilled trusses/ king studs over spaced at pannel. no insp. just conf.
BLD-Conference1/23/20171/24/20171/24/2017APASS
DetailsTony Young
Fire blocking for the exterior chimney to allow for cover

Call Tim if any problems. Thank you Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Other10/25/201610/27/201610/27/2016ANR
DetailsTony Young
Call Tim if any problems. Thank you Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, fire place chase
BLD-Energy code compliance10/24/201610/25/201610/25/2016APASS
DetailsTony Young
Call Tim if any problems. Thank you Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Energy code compliance10/24/201610/24/201610/24/2016PPART
DetailsTony Young
Call Tim if any problems. Thank you Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, basement ok after sealing around pipes and wires in plate lines
BLD-Energy code compliance10/24/201610/24/201610/24/2016ACANC
DetailsTony Young
Call Tim if any problems. Thank you Phone #: ###-#### >> Inspection requested via web by Timothy Beaudoin Inspection cancelled from web by: Timothy Beaudoin
BLD-Conference10/21/201610/21/201610/21/2016PPART
DetailsTony Young
Insulation is finishing now. The framing corrections have been made

Call if any problems. Thank you Phone #: ###-#### Inspection requested via web by Timothy Beaudoin/// conf on frame
BLD-Energy code compliance10/14/201610/17/201610/17/2016ANR
DetailsTony Young
Call Tim if any questions Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Framing/Rough-in10/13/201610/14/201610/14/2016APART
DetailsTony Young
Call Tim if any questions Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, most frame corrections done,, still ok to insulate
BLD-Framing/Rough-in10/13/201610/13/201610/13/2016PPART
DetailsTony Young
Call Tim if any questions Phone #: ###-#### Inspection requested via web by Timothy Beaudoin,, see paint marks,, need fire place approval.. ok to insulate
BLD-Aging Inspection8/12/20168/12/20168/15/2016 PASS
DetailsTony Young
BLD-Aging Inspection8/11/20168/11/20168/12/2016 PASS
DetailsTony Young
BLD-Conference6/21/20166/22/20166/22/2016APASS
DetailsDave Hannah
Please sign off for the bond. The house is now down on its new foundation Phone #: ###-#### Inspection requested via web by Timothy Beaudoin house is setting on foundation
BLD-Foundation3/29/20163/30/20163/30/2016APASS
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing3/25/20163/25/20163/25/2016PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, garage,, work in progress
BLD-Conference2/2/20162/2/20162/2/2016PPASS
DetailsTony Young
Call Tim with any questions Phone #: ###-#### Inspection requested via web by Timothy Beaudoin/// ok to keep active
BLD-Aging Inspection1/29/20161/29/20161/29/2016 PEND
DetailsTony Young
BLD-Footing9/17/20159/17/20159/17/2015APART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing8/27/20158/27/20158/27/2015PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, single level area
BLD-Foundation7/30/20157/30/20157/30/2015PPART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, basement wall,, work in progress,, ok
BLD-Footing7/24/20157/27/20157/27/2015APART
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,,basement house ftgs
BLD-Footing7/13/20157/13/20157/13/2015PNR
DetailsTony Young
Phone #: 2086971241 >> Inspection requested via mobile web by Heron