BLD-Final | 11/16/2015 | 11/17/2015 | 11/17/2015 | A | PASS |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
DOC - Permit Finaled | 11/17/2015 | 11/17/2015 | 11/17/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/12/2015 | 11/13/2015 | 11/13/2015 | A | NR |
Dave Hannah
|
|
|
Tom Phone #: ###-####
|
BLD-Final | 11/9/2015 | 11/10/2015 | 11/10/2015 | A | NR |
Dave Hannah
|
|
|
Tom Phone #: ###-####needs mec final first
|
BLD-Framing/Rough-in | 9/18/2015 | 9/18/2015 | 9/18/2015 | P | PASS |
Mike Jordan
|
|
|
Tom Phone #: ###-####
|
BLD-Energy code compliance | 9/17/2015 | 9/17/2015 | 9/17/2015 | P | FAIL |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Energy ok, framing cporrections not completed.
|
BLD-Framing/Rough-in | 9/15/2015 | 9/15/2015 | 9/15/2015 | P | FAIL |
Mike Jordan
|
|
|
Tom// please call prior Phone #: ###-####. Fire block barrell vault, Seal abs pipe penetrations at top plates. Nail off simpson hangars on T26 trusses, Nail the 2 ply t03,t06 and tg01 per the truss engineering. ok to insulate, correction notice posted.
|
BLD-Framing/Rough-in | 9/14/2015 | 9/14/2015 | 9/14/2015 | P | FAIL |
Mike Jordan
|
|
|
Tom Phone #: ###-####. Provide truss engineering, Need plumbing rough in inspection. Provide full height roll blocking on T 10 trusses. Install the required 2x12 ledger @ kitchen with the required 4 sds screws @ each stud location per the approved plans. Corrrection notice posted.
|
BLD-Wall Bracing | 8/28/2015 | 8/31/2015 | 8/31/2015 | A | PASS |
Dave Hannah
|
|
|
Shippy Phone #: ###-####
|
BLD-Foundation | 8/12/2015 | 8/12/2015 | 8/12/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 8/11/2015 | 8/11/2015 | 8/11/2015 | P | PASS |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|