Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-02368
StatusFinaled
Name ESI
Site Address 777 W MAIN ST Unit: 900
Project NameClearwater Analytics
Customer Number 
ePlanReviewYes
Description
(CLEARWATER ANALYTICS – CITY CENTER PLAZA – 5TH, 6TH, 7TH, 8TH, AND 9TH STORIES) (1-14-16 PLAN MODIFICATION TO CREATE A 1,030 SQUARE FOOT BIKE STORAGE ROOM ON THE 1ST STORY, SCALE BACK PREVIOUSLY PROPOSED WORK ON THE 5TH STORY, AND TO ESTABLISH OCCUPANCY FOR THE 10TH STORY THAT WAS COMPLETED UNDER A PLAN MOD TO THE SHELL AND CORE PERMIT.) The fire sprinkler system is used for occupancy and to comply with the high-rise requirements of the building code. 5th story: To construct a 1,999 square foot office tenant space and to create 7 shower rooms, four of which are required to be accessible to the disabled. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, and finishes. 6th story: To construct a 23,175 square foot whole story office tenant space. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, and finishes. 7th story: To construct a 23,176 square foot whole story office tenant space. Work is to include interior nonbearing walls, interior doors, a server room, interior windows, millwork, and finishes. A cooling system will be installed to serve the data center (server room) located on the 7th story. No element of the structure is allowed to be over stressed by the weight of the new equipment. 8th story: To construct a 22,606 square foot whole story office and assembly tenant space. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, and finishes. There is a 1,704 square foot conference room, an 892 square foot break room, a 2,050 square foot terrace, and a 475 square foot terrace on this level. The rest of the 8th story is small conference rooms and office areas. An open interior stairway having no enclosed usable space below it will be constructed between the 8th and 9th stories. Special Inspection is required for welding. 9th story: To construct a 20,022 square foot whole story office and assembly tenant space. Work is to include interior nonbearing walls, interior doors, interior windows, millwork, and finishes. There is a 2,687 square foot gym on this story. 10th story: To establish occupancy for the 10th story that was completed under a plan mod to the shell and core permit. The total floor area is about 1,429 square feet and the total occupant load is 30 (8 office inside and 22 assembly on the terrace). The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/16/201611/16/201611/16/2016APASS
DetailsDave Hannah
Ok for permanent occupancy once bond posted.
BLD-Final8/17/20168/18/20168/18/2016PPART
DetailsMike Jordan
Nathan Phone #: ###-####. Ok for temp occ. on 9th. floor only.
BLD-Ceiling Grid Inspection8/18/20168/18/20168/18/2016PPASS
DetailsMike Jordan
Just to follow up from inspection performed earlier this week. 9th floor ceiling grid at CW TI. Thanks. AKJ Phone #: ###-#### Inspection requested via web by Adam Johnson
FIRE-Final Inspection8/17/20168/18/20168/18/2016APASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for level 9 complete.
FIRE-Final Inspection8/15/20168/16/20168/16/2016PFAIL
DetailsJim Page
Fire sprinkler heads still masked off for painting, heads need to be uncovered and escutcheons need to be installed, numerous heads missing escutcheons throught level 9. Fire alarm inspection is complete and fire extinguishers are in place with current inspection tags.
BLD-Final8/4/20168/5/20168/5/2016APART
DetailsDave Hannah
Nathan Phone #: ###-#### ok for temp occ on 8th floor
BLD-Conference8/1/20168/2/20168/5/2016APART
DetailsDave Hannah
ok to occ floors 6and 7
FIRE-Final Inspection8/3/20168/4/20168/4/2016APART
DetailsJim Page
Fire sprinkler inspections have been completed for TI section of levels 5, 6, 7, and 8. Fire alarm inspection for audio visual devices (floor above and floor below alarm notification has been tested and is satisfactory, level 4 has core and shell audio visual, no tenant improvement visuals at time of this inspection) have been completed on TI section of levels 5, 6, 7, and 8, in-duct detectors will need to be tested when the post fire smoke evacuation system is completed. Fire extinguishers are in place on levels 5, 6, 7, and 8, some of the fire extinguishers need to be inspected and tagged, fire extinguisher tags will be verified during final inspection at completion of entire project. Life fire safety inspection complete for TI levels 5, 6, 7 and 8 with exception to the fire extinguisher inspection tags and post fire smoke evacuation system.
BLD-Conference7/20/20167/21/20167/22/2016PCANC
DetailsDave Hannah
Ongoing walks of Clearwater TI, OH Framing and Firestop assemblies. akj 7-20-16 Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection7/19/20167/19/20167/20/2016PPART
DetailsDave Hannah
Verification of Ceiling OH Fire assemblies, ready to flood, 6th and 7th Floor TI. akj Phone #: ###-#### Inspection requested via web by Adam Johnson ok on 7th
BLD-Ceiling Grid Inspection7/18/20167/18/20167/18/2016ANR
DetailsDave Hannah
Ceiling grid inspection, 6th and 7th floors. Review f/s and f/c assemblies. Akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Ceiling Grid Inspection6/13/20166/13/20166/14/2016PNR
DetailsDave Hannah
6th Floor Clearwater TI Ceiling Grid inspection. MEP complete. Final verification for approve to cover.akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Conference6/13/20166/13/20166/14/2016PNR
DetailsDave Hannah
8th and 9th Floors fireproofing approval for cover. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in5/25/20165/26/20165/27/2016PPASS
DetailsDave Hannah
6/7th floor exteriors at Slab edge North Elevation M;M Hoist patch Back. akj Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in5/16/20165/17/20165/18/2016APASS
DetailsDave Hannah
MEP''s Complete. Review of interior framing for cover. akj. Phone #: ###-#### Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in3/4/20163/4/20163/7/2016PPART
DetailsDave Hannah
follow-up inspection 6th & 7th floor coordinate sign-off w/ Adam Phone #: ###-#### int walls see signoff sheets in office