BLD-Final | 12/3/2015 | 12/4/2015 | 12/4/2015 | A | PASS |
Tony Young
|
|
|
Tod Phone #: ###-####
|
DOC - Permit Finaled | 12/4/2015 | 12/4/2015 | 12/4/2015 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Energy code compliance | 10/8/2015 | 10/9/2015 | 10/12/2015 | P | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Wall cover | 10/8/2015 | 10/9/2015 | 10/12/2015 | P | PASS |
Tony Young
|
|
|
This is for the re-inspection of the corrections at the stairs. Phone #: ###-#### Inspection requested via web by Scott Asin
|
BLD-Framing/Rough-in | 10/6/2015 | 10/6/2015 | 10/6/2015 | P | PART |
Jim Sly
|
|
|
We are asking for the framing inspection. Electrical, HVAC and plumbing inspections have been done and the foam and caulk is done. Thank you. Phone #: ###-#### Inspection requested via web by Scott Asin C/N Non complying winders. OK to insulate.
|
BLD-Framing/Rough-in | 10/5/2015 | 10/7/2015 | 10/6/2015 | A | CANC |
Tony Young
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Asin Inspection cancelled from web by: Scott Asin
|
BLD-Wall Bracing | 9/9/2015 | 9/10/2015 | 9/10/2015 | A | PASS |
Tony Young
|
|
|
Todd Phone #: ###-####
|
BLD-Wall Bracing | 9/8/2015 | 9/9/2015 | 9/9/2015 | A | DEFR |
Tony Young
|
|
|
Todd Phone #: ###-####, ok to cover exterior
|
BLD-Wall Bracing | 9/4/2015 | 9/8/2015 | 9/8/2015 | A | PART |
Tony Young
|
|
|
Todd Phone #: ###-####,, needs blocking and nailing
|
BLD-Foundation | 8/11/2015 | 8/12/2015 | 8/12/2015 | P | PART |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 8/10/2015 | 8/11/2015 | 8/11/2015 | P | PART |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 8/7/2015 | 8/10/2015 | 8/10/2015 | P | NR |
Tony Young
|
|
|
Dane Phone #: ###-####
|
BLD-Foundation | 8/6/2015 | 8/7/2015 | 8/7/2015 | P | CANC |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|