BLD-Final | 1/19/2018 | 1/22/2018 | 1/19/2018 | A | PASS |
Dave Hannah
|
|
|
Nathan Phone #: ###-####
|
BLD-Other | 8/3/2017 | 8/4/2017 | 8/4/2017 | P | FAIL |
Dave Hannah
|
|
|
fire caulk for the O2 rooms // John Phone #: ###-####
|
BLD-Framing/Rough-in | 8/2/2017 | 8/3/2017 | 8/4/2017 | P | PEND |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Framing/Rough-in | 7/31/2017 | 7/31/2017 | 8/2/2017 | P | CANC |
Dave Hannah
|
|
|
framing for level 4 & 5 // John Phone #: ###-#### ok to cover rooms but not bathrooms
|
BLD-Ceiling Grid Inspection | 7/28/2017 | 7/28/2017 | 7/31/2017 | P | PASS |
Dave Hannah
|
|
|
Level 9 // John Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 7/13/2017 | 7/14/2017 | 7/28/2017 | P | PASS |
Dave Hannah
|
|
|
John Phone #: 385###-####
|
BLD-Framing/Rough-in | 7/27/2017 | 7/27/2017 | 7/28/2017 | P | PASS |
Dave Hannah
|
|
|
1st floor linen chute // John Phone #: ###-####
|
BLD-Framing/Rough-in | 7/24/2017 | 7/24/2017 | 7/25/2017 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | PART |
Jim Sly
|
|
|
John Phone #: ###-#### Inspection of drop-off area.......Soffits. All OK except for approx. 35 x 18 ft. area located above the stamped concrete. will inspect at later date.
|
BLD-Framing/Rough-in | 7/18/2017 | 7/19/2017 | 7/19/2017 | A | PASS |
Mike Jordan
|
|
|
John Phone #: ###-####. Interior steel stud framed walls and insualtion with vapor barrier at rooms 602 and 802.
|
BLD-Ceiling Grid Inspection | 7/13/2017 | 7/13/2017 | 7/16/2017 | P | PASS |
Dave Hannah
|
|
|
John-level 4 corridores Phone #: ###-#### also 5,6,7,8
|
BLD-Framing/Rough-in | 7/10/2017 | 7/11/2017 | 7/12/2017 | P | PART |
Dave Hannah
|
|
|
linen chute shaft (2:30-3ish) // Tom Bigham Phone #: ###-#### fl 5-10 ok to cover
|
BLD-Framing/Rough-in | 7/6/2017 | 7/7/2017 | 7/11/2017 | A | NR |
Dave Hannah
|
|
|
levels 4 & 7 // John Bigham Phone #: ###-####
|
BLD-Framing/Rough-in | 6/29/2017 | 6/30/2017 | 6/30/2017 | A | PASS |
Dave Hannah
|
|
|
ceiling framing on stairwell // John Phone #: ###-#### elev lobbies ok
|
BLD-Ceiling Grid Inspection | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PART |
Mike Jordan
|
|
|
john Phone #: ###-####. 8th. floor corridor grid. Still needs to fire caulk sprinkler pipe penetrations and conduits at IFR room. Ok to place tile in middle of corridor for light install. interior shaft board for shaft on roof ok. ok to rock exterior side.
|
BLD-Framing/Rough-in | 6/20/2017 | 6/21/2017 | 6/21/2017 | A | PASS |
Dave Hannah
|
|
|
stairwell 1 // John Phone #: ###-####
|
BLD-Other | 6/19/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Dave Hannah
|
|
|
john - fire caulk Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 6/9/2017 | 6/9/2017 | 6/9/2017 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### third floor stair tower cieling center stair ok to cover lid on third fl
|
BLD-Framing/Rough-in | 6/5/2017 | 6/6/2017 | 6/6/2017 | A | PEND |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Other | 5/25/2017 | 5/26/2017 | 5/26/2017 | A | PASS |
Jim Storey
|
|
|
John-elevator shaft Phone #: ###-####1 thur 10 floors service and passenger shaft liner and fire stopping ok to cover.
|
BLD-Ceiling Grid Inspection | 5/23/2017 | 5/23/2017 | 5/24/2017 | P | PASS |
Dave Hannah
|
|
|
john - 10th floor Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 5/17/2017 | 5/18/2017 | 5/18/2017 | A | FAIL |
Dave Hannah
|
|
|
John 10th floor Phone #: ###-####
|
BLD-Energy code compliance | 5/8/2017 | 5/8/2017 | 5/9/2017 | P | PASS |
Dave Hannah
|
|
|
exterior insulation for 10th floor // John Bigham Phone #: ###-#### ok to cover walls
|
BLD-Framing/Rough-in | 5/5/2017 | 5/5/2017 | 5/7/2017 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-#### third floor common area nw corner sliding wall ceiling framing ok
|
BLD-Framing/Rough-in | 5/2/2017 | 5/3/2017 | 5/4/2017 | A | PART |
Dave Hannah
|
|
|
10th floor framing // John Bigham Phone #: ###-#### ok to insulate
|
BLD-Framing/Rough-in | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | PASS |
Dave Hannah
|
|
|
1st floor ceiling framing // John Bigham Phone #: ###-####
|
BLD-Framing/Rough-in | 4/25/2017 | 4/26/2017 | 4/26/2017 | A | PASS |
Dave Hannah
|
|
|
South front entry // John Phone #: ###-####
|
BLD-Energy code compliance | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PASS |
Dave Hannah
|
|
|
level 9; John Phone #: ###-####
|
BLD-Framing/Rough-in | 4/19/2017 | 4/19/2017 | 4/21/2017 | P | PART |
Dave Hannah
|
|
|
john Phone #: ###-#### ok to insulate
|
BLD-Energy code compliance | 4/18/2017 | 4/18/2017 | 4/18/2017 | P | PART |
Dave Hannah
|
|
|
3rd floor; john Phone #: ###-#### area around pool ok
|
BLD-Framing/Rough-in | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | PART |
Jim Storey
|
|
|
Front entry - John Phone #: ###-#### exterior framing nw entry and insulation exterior walls ok.
|
BLD-Framing/Rough-in | 4/7/2017 | 4/7/2017 | 4/10/2017 | P | PASS |
Dave Hannah
|
|
|
George Phone #: ###-#### 8th floor
|
BLD-Framing/Rough-in | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | CANC |
Dave Hannah
|
|
|
level 8 &1 - would like call ahead; John Phone #: ###-#### fire wall between lobby and garage ok and east side of 8th floor ok to cover
|
BLD-Framing/Rough-in | 4/3/2017 | 4/4/2017 | 4/4/2017 | A | PART |
Dave Hannah
|
|
|
level 1; John Phone #: ###-#### 1st floor and 3rd floor ok
|
BLD-Framing/Rough-in | 3/29/2017 | 3/29/2017 | 3/29/2017 | P | NR |
Dave Hannah
|
|
|
Level 1 // John Phone #: ###-#### needs elec rough in
|
BLD-Framing/Rough-in | 3/27/2017 | 3/28/2017 | 3/29/2017 | A | PASS |
Dave Hannah
|
|
|
level 7 Phone #: ###-####
|
BLD-Framing/Rough-in | 3/27/2017 | 3/27/2017 | 3/27/2017 | P | NR |
Mike Jordan
|
|
|
Level 7 // John Phone #: ###-####. Per contractor, fire sprinkler rough in not yet ready. Will recall.
|
BLD-Framing/Rough-in | 3/21/2017 | 3/22/2017 | 3/23/2017 | A | PART |
Dave Hannah
|
|
|
level 7 and top down for level 8 and 9 // John Phone #: ###-#### ok to to run a stripe on top of walls floors 8 and 9
|
BLD-Framing/Rough-in | 3/9/2017 | 3/10/2017 | 3/20/2017 | P | PART |
Dave Hannah
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 3/16/2017 | 3/16/2017 | 3/16/2017 | P | PASS |
Dave Hannah
|
|
|
6th floor; John Phone #: ###-####
|
BLD-Framing/Rough-in | 3/1/2017 | 3/2/2017 | 3/6/2017 | A | PASS |
Dave Hannah
|
|
|
5th floor // John Phone #: ###-####
|
BLD-Framing/Rough-in | 3/3/2017 | 3/3/2017 | 3/6/2017 | P | PASS |
Dave Hannah
|
|
|
John-5th floor Phone #: ###-####
|
BLD-Other | 2/24/2017 | 2/27/2017 | 3/2/2017 | P | PART |
Dave Hannah
|
|
|
John-shaft liner Phone #: ###-#### ok to insulate ext walls onfloors 6and7 and rock top 2 ft shafts on 5 ok to cover floor4 ok to cover wall and shafts 3rd floor ok to cover east side.
|
BLD-Other | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PART |
Dave Hannah
|
|
|
Shaft lining, 4th fl - John Phone #: ###-#### third and fourth floors ok to close
|
BLD-Framing/Rough-in | 2/21/2017 | 2/21/2017 | 2/21/2017 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | DONE |
Mike Jordan
|
|
|
John Phone #: ###-####,, 4th floor. Per John, no inspection needed at this time.
|
BLD-Framing/Rough-in | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PART |
Tony Young
|
|
|
John Phone #: ###-####,, insulation ok,, need fire caulking tune up above ceiling line,, will re inspect
|
BLD-Framing/Rough-in | 2/8/2017 | 2/8/2017 | 2/8/2017 | P | PART |
Dave Hannah
|
|
|
John// levels 4 and 5 Phone #: ###-#### part 4th floor insulation ok to cover walls 5th floor ok to top of walls
|
BLD-Framing/Rough-in | 2/1/2017 | 2/1/2017 | 2/1/2017 | A | CANC |
Dave Hannah
|
|
|
Top down drywall and insulation and demising wall drywall Phone #: ###-#### Inspection requested via web by Jim Williams ok to cover top of walls on 3rd and 4th floors and tent sepperation wall on three
|
BLD-Framing/Rough-in | 1/3/2017 | 1/4/2017 | 1/4/2017 | A | PART |
Dave Hannah
|
|
|
Periodical framing, exterior sheeting, masonry veneer substrate. Phone #: ###-#### Inspection requested via web by Jim Williams third floor ok
|
BLD-Framing/Rough-in | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PART |
Dave Hannah
|
|
|
Periodic framing inspection for exterior sheathing Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Wall cover | 12/2/2016 | 12/2/2016 | 12/2/2016 | A | PEND |
Dave Hannah
|
|
|
Periodic progress inspection on framing and exterior sheathing. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Framing/Rough-in | 12/1/2016 | 12/1/2016 | 12/2/2016 | P | PART |
Dave Hannah
|
|
|
Periodic progress inspection on framing and exterior sheathing. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Framing/Rough-in | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PEND |
Dave Hannah
|
|
|
Beginning exterior sheathing. We like to review framing and screwing requirements. Phone #: ###-#### Inspection requested via web by Jim Williams need to see details
|
BLD-Concrete | 10/19/2016 | 10/20/2016 | 10/31/2016 | A | PEND |
Dave Hannah
|
|
|
elevator core level 8-9, reinforcement swimming pool. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams ok after spec insp sign off
|
BLD-Framing/Rough-in | 9/27/2016 | 9/27/2016 | 9/27/2016 | A | PASS |
Dave Hannah
|
|
|
mock up rooms on 4th floor
|
BLD-Concrete | 9/26/2016 | 9/26/2016 | 9/27/2016 | P | PEND |
Dave Hannah
|
|
|
PT deck level 7 north. SI is on site today. SI is scheduled for a 2am 9/27 concrete. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams ok after mti sign off
|
BLD-Framing/Rough-in | 9/22/2016 | 9/22/2016 | 9/22/2016 | A | FAIL |
Dave Hannah
|
|
|
Model room framing level 4 rooms 405 and 408. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Concrete | 9/15/2016 | 9/15/2016 | 9/16/2016 | P | PEND |
Dave Hannah
|
|
|
Elevator core and stair core 2 levels 6-7. SI has been onsite to inspect rebar and is scheduled. 12 pm concrete today for elevator core. 12 pm tomorrow for stair 2 Thanks Phone #: ###-#### Inspection requested via web by Jim Williams ok after spec inpc ok
|
BLD-Concrete | 9/8/2016 | 9/8/2016 | 9/12/2016 | P | PEND |
Dave Hannah
|
|
|
Level 6 PT deck pour 2(north 1/2). Special Inspector has been on site for periodic inspections and is scheduled for today. Concrete scheduled for 12 am 9/8. SI is scheduled for concrete pour. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Concrete | 8/26/2016 | 8/26/2016 | 8/29/2016 | A | PART |
Dave Hannah
|
|
|
PT deck 6th floor pour 1(south 1/2). SI is scheduled and will be on site for pour. Concrete scheduled for 12 am 8/27 Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Conference | 8/18/2016 | 8/18/2016 | 8/19/2016 | P | DEFR |
Mike Jordan
|
|
|
Stair tower 1 from level 5 to level 6. SI is scheduled for pour and is on site this morning. Concrete scheduled for 2:30 pm. SI will be present for pour. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Concrete | 8/16/2016 | 8/16/2016 | 8/16/2016 | P | DEFR |
Mike Jordan
|
|
|
Level 5 pour 2 (north 1/2) PT deck. SI has been on site and is scheduled for today. Structural Engineer is scheduled to visit this afternoon. Concrete is schedule for 12:00 am 8/17 SI is scheduled to attend pour. Phone #: ###-#### Inspection requested via web by Jim Williams. No time. Specail inspector on site.
|
BLD-Concrete | 8/9/2016 | 8/9/2016 | 8/9/2016 | A | PEND |
Dave Hannah
|
|
|
Level 5 pour 1 (south 1/2) PT deck. SI has been on site and is scheduled. Concrete is scheduled for 12 am 8/10 Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Concrete | 8/5/2016 | 8/5/2016 | 8/5/2016 | P | PEND |
Dave Hannah
|
|
|
Stair core 2 and elevator shaft walls levels 4-5. SI is onsite inspecting reinforcement placing. Concrete schedule for 8 am tomorrow morning. SI is scheduled. Our new office is across Capitol at 439 S Capitol. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Aging Inspection | 8/3/2016 | 8/3/2016 | 8/5/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 8/2/2016 | 8/2/2016 | 8/5/2016 | | PEND |
Dave Hannah
|
|
|
|
BLD-Concrete | 7/27/2016 | 7/27/2016 | 7/28/2016 | P | PEND |
Dave Hannah
|
|
|
PT slab level 4 pour 2. SI on site. Structural Engineer reviewed 7/26. Concrete schedule for 12 am 7/28. SI scheduled for pour. Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Foundation | 3/17/2016 | 3/18/2016 | 3/21/2016 | A | PASS |
Dave Hannah
|
|
|
Ramp walls grid lines C.5 and D.5 6.5-8. SI scheduled. Concrete scheduled 2 pm. Columns YZ grid(2), C.1 and F.4 SI scheduled. Concrete scheduled 10 am Saturday Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Footing | 3/14/2016 | 3/14/2016 | 3/15/2016 | P | PEND |
Dave Hannah
|
|
|
Footing FS 42'' x 86'' Phone #: ###-#### Inspection requested via web by Jim Williams
|
BLD-Footing | 1/19/2016 | 1/20/2016 | 1/20/2016 | A | PEND |
Dave Hannah
|
|
|
Jim Phone #: ###-#### ok after spec inp sign off
|
BLD-Footing | 1/12/2016 | 1/13/2016 | 1/13/2016 | A | PART |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|