Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberBLD15-02707
StatusFinaled
Name BIG D CONSTRUCTION
Site Address 400 S CAPITOL BLVD
Project NameResidence Inn by Marriott
Customer Number 
ePlanReviewYes
Description
PROJECT MANAGEMENT - Angie Brosious (RESIDENCE INN BY MARRIOTT - Foundation and Site Work Only) Residential hotel with 8 stories of R-1 above a horizontal separation and 2 stories of S-2 parking and a separated A-3 occupancy. Scope of work: new foundation, new underground utilities to site, and site work. THIS REVIEW IS FOR FOOTING/FOUNDATION/GRADING PERMITS ONLY. Other architectural sheets submitted are for reference only. Shell and Core Submitted under BLD15-03489. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/19/20181/22/20181/19/2018APASS
DetailsDave Hannah
Nathan Phone #: ###-####
BLD-Other8/3/20178/4/20178/4/2017PFAIL
DetailsDave Hannah
fire caulk for the O2 rooms // John Phone #: ###-####
BLD-Framing/Rough-in8/2/20178/3/20178/4/2017PPEND
DetailsDave Hannah
Jon Phone #: ###-####
BLD-Framing/Rough-in7/31/20177/31/20178/2/2017PCANC
DetailsDave Hannah
framing for level 4 & 5 // John Phone #: ###-#### ok to cover rooms but not bathrooms
BLD-Ceiling Grid Inspection7/28/20177/28/20177/31/2017PPASS
DetailsDave Hannah
Level 9 // John Phone #: ###-####
BLD-Ceiling Grid Inspection7/13/20177/14/20177/28/2017PPASS
DetailsDave Hannah
John Phone #: 385###-####
BLD-Framing/Rough-in7/27/20177/27/20177/28/2017PPASS
DetailsDave Hannah
1st floor linen chute // John Phone #: ###-####
BLD-Framing/Rough-in7/24/20177/24/20177/25/2017PPART
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in7/19/20177/20/20177/20/2017PPART
DetailsJim Sly
John Phone #: ###-####
Inspection of drop-off area.......Soffits. All OK except for approx. 35 x 18 ft. area located above the stamped concrete. will inspect at later date.
BLD-Framing/Rough-in7/18/20177/19/20177/19/2017APASS
DetailsMike Jordan
John Phone #: ###-####. Interior steel stud framed walls and insualtion with vapor barrier at rooms 602 and 802.
BLD-Ceiling Grid Inspection7/13/20177/13/20177/16/2017PPASS
DetailsDave Hannah
John-level 4 corridores Phone #: ###-#### also 5,6,7,8
BLD-Framing/Rough-in7/10/20177/11/20177/12/2017PPART
DetailsDave Hannah
linen chute shaft (2:30-3ish) // Tom Bigham Phone #: ###-#### fl 5-10 ok to cover
BLD-Framing/Rough-in7/6/20177/7/20177/11/2017ANR
DetailsDave Hannah
levels 4 & 7 // John Bigham Phone #: ###-####
BLD-Framing/Rough-in6/29/20176/30/20176/30/2017APASS
DetailsDave Hannah
ceiling framing on stairwell // John Phone #: ###-#### elev lobbies ok
BLD-Ceiling Grid Inspection6/22/20176/23/20176/23/2017APART
DetailsMike Jordan
john Phone #: ###-####. 8th. floor corridor grid. Still needs to fire caulk sprinkler pipe penetrations and conduits at IFR room. Ok to place tile in middle of corridor for light install. interior shaft board for shaft on roof ok. ok to rock exterior side.
BLD-Framing/Rough-in6/20/20176/21/20176/21/2017APASS
DetailsDave Hannah
stairwell 1 // John Phone #: ###-####
BLD-Other6/19/20176/20/20176/20/2017APASS
DetailsDave Hannah
john - fire caulk Phone #: ###-####
BLD-Ceiling Grid Inspection6/9/20176/9/20176/9/2017PPART
DetailsDave Hannah
John Phone #: ###-#### third floor stair tower cieling center stair ok to cover lid on third fl
BLD-Framing/Rough-in6/5/20176/6/20176/6/2017APEND
DetailsDave Hannah
John Phone #: ###-####
BLD-Other5/25/20175/26/20175/26/2017APASS
DetailsJim Storey
John-elevator shaft Phone #: ###-####1 thur 10 floors service and passenger shaft liner and fire stopping ok to cover.
BLD-Ceiling Grid Inspection5/23/20175/23/20175/24/2017PPASS
DetailsDave Hannah
john - 10th floor Phone #: ###-####
BLD-Ceiling Grid Inspection5/17/20175/18/20175/18/2017AFAIL
DetailsDave Hannah
John 10th floor Phone #: ###-####
BLD-Energy code compliance5/8/20175/8/20175/9/2017PPASS
DetailsDave Hannah
exterior insulation for 10th floor // John Bigham Phone #: ###-#### ok to cover walls
BLD-Framing/Rough-in5/5/20175/5/20175/7/2017PPART
DetailsDave Hannah
John Phone #: ###-#### third floor common area nw corner sliding wall ceiling framing ok
BLD-Framing/Rough-in5/2/20175/3/20175/4/2017APART
DetailsDave Hannah
10th floor framing // John Bigham Phone #: ###-#### ok to insulate
BLD-Framing/Rough-in5/2/20175/2/20175/2/2017PPASS
DetailsDave Hannah
1st floor ceiling framing // John Bigham Phone #: ###-####
BLD-Framing/Rough-in4/25/20174/26/20174/26/2017APASS
DetailsDave Hannah
South front entry // John Phone #: ###-####
BLD-Energy code compliance4/21/20174/21/20174/21/2017PPASS
DetailsDave Hannah
level 9; John Phone #: ###-####
BLD-Framing/Rough-in4/19/20174/19/20174/21/2017PPART
DetailsDave Hannah
john Phone #: ###-#### ok to insulate
BLD-Energy code compliance4/18/20174/18/20174/18/2017PPART
DetailsDave Hannah
3rd floor; john Phone #: ###-#### area around pool ok
BLD-Framing/Rough-in4/13/20174/14/20174/14/2017APART
DetailsJim Storey
Front entry - John Phone #: ###-#### exterior framing nw entry and insulation exterior walls ok.
BLD-Framing/Rough-in4/7/20174/7/20174/10/2017PPASS
DetailsDave Hannah
George Phone #: ###-#### 8th floor
BLD-Framing/Rough-in4/5/20174/6/20174/6/2017ACANC
DetailsDave Hannah
level 8 &1 - would like call ahead; John Phone #: ###-#### fire wall between lobby and garage ok and east side of 8th floor ok to cover
BLD-Framing/Rough-in4/3/20174/4/20174/4/2017APART
DetailsDave Hannah
level 1; John Phone #: ###-#### 1st floor and 3rd floor ok
BLD-Framing/Rough-in3/29/20173/29/20173/29/2017PNR
DetailsDave Hannah
Level 1 // John Phone #: ###-#### needs elec rough in
BLD-Framing/Rough-in3/27/20173/28/20173/29/2017APASS
DetailsDave Hannah
level 7 Phone #: ###-####
BLD-Framing/Rough-in3/27/20173/27/20173/27/2017PNR
DetailsMike Jordan
Level 7 // John Phone #: ###-####. Per contractor, fire sprinkler rough in not yet ready. Will recall.
BLD-Framing/Rough-in3/21/20173/22/20173/23/2017APART
DetailsDave Hannah
level 7 and top down for level 8 and 9 // John Phone #: ###-#### ok to to run a stripe on top of walls floors 8 and 9
BLD-Framing/Rough-in3/9/20173/10/20173/20/2017PPART
DetailsDave Hannah
John Phone #: ###-####
BLD-Framing/Rough-in3/16/20173/16/20173/16/2017PPASS
DetailsDave Hannah
6th floor; John Phone #: ###-####
BLD-Framing/Rough-in3/1/20173/2/20173/6/2017APASS
DetailsDave Hannah
5th floor // John Phone #: ###-####
BLD-Framing/Rough-in3/3/20173/3/20173/6/2017PPASS
DetailsDave Hannah
John-5th floor Phone #: ###-####
BLD-Other2/24/20172/27/20173/2/2017PPART
DetailsDave Hannah
John-shaft liner Phone #: ###-#### ok to insulate ext walls onfloors 6and7 and rock top 2 ft shafts on 5 ok to cover floor4 ok to cover wall and shafts 3rd floor ok to cover east side.
BLD-Other2/22/20172/23/20172/23/2017APART
DetailsDave Hannah
Shaft lining, 4th fl - John Phone #: ###-#### third and fourth floors ok to close
BLD-Framing/Rough-in2/21/20172/21/20172/21/2017PCANC
DetailsMike Jordan
BLD-Framing/Rough-in2/17/20172/21/20172/21/2017ADONE
DetailsMike Jordan
John Phone #: ###-####,, 4th floor. Per John, no inspection needed at this time.
BLD-Framing/Rough-in2/16/20172/17/20172/17/2017APART
DetailsTony Young
John Phone #: ###-####,, insulation ok,, need fire caulking tune up above ceiling line,, will re inspect
BLD-Framing/Rough-in2/8/20172/8/20172/8/2017PPART
DetailsDave Hannah
John// levels 4 and 5 Phone #: ###-#### part 4th floor insulation ok to cover walls 5th floor ok to top of walls
BLD-Framing/Rough-in2/1/20172/1/20172/1/2017ACANC
DetailsDave Hannah
Top down drywall and insulation and demising wall drywall Phone #: ###-#### Inspection requested via web by Jim Williams ok to cover top of walls on 3rd and 4th floors and tent sepperation wall on three
BLD-Framing/Rough-in1/3/20171/4/20171/4/2017APART
DetailsDave Hannah
Periodical framing, exterior sheeting, masonry veneer substrate. Phone #: ###-#### Inspection requested via web by Jim Williams third floor ok
BLD-Framing/Rough-in12/8/201612/8/201612/8/2016PPART
DetailsDave Hannah
Periodic framing inspection for exterior sheathing Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Wall cover12/2/201612/2/201612/2/2016APEND
DetailsDave Hannah
Periodic progress inspection on framing and exterior sheathing. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Framing/Rough-in12/1/201612/1/201612/2/2016PPART
DetailsDave Hannah
Periodic progress inspection on framing and exterior sheathing. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Framing/Rough-in11/21/201611/22/201611/22/2016APEND
DetailsDave Hannah
Beginning exterior sheathing. We like to review framing and screwing requirements. Phone #: ###-#### Inspection requested via web by Jim Williams need to see details
BLD-Concrete10/19/201610/20/201610/31/2016APEND
DetailsDave Hannah
elevator core level 8-9, reinforcement swimming pool.
Thanks Phone #: ###-#### Inspection requested via web by Jim Williams ok after spec insp sign off
BLD-Framing/Rough-in9/27/20169/27/20169/27/2016APASS
DetailsDave Hannah
mock up rooms on 4th floor
BLD-Concrete9/26/20169/26/20169/27/2016PPEND
DetailsDave Hannah
PT deck level 7 north. SI is on site today. SI is scheduled for a 2am 9/27 concrete. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams ok after mti sign off
BLD-Framing/Rough-in9/22/20169/22/20169/22/2016AFAIL
DetailsDave Hannah
Model room framing level 4 rooms 405 and 408. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete9/15/20169/15/20169/16/2016PPEND
DetailsDave Hannah
Elevator core and stair core 2 levels 6-7. SI has been onsite to inspect rebar and is scheduled. 12 pm concrete today for elevator core. 12 pm tomorrow for stair 2 Thanks Phone #: ###-#### Inspection requested via web by Jim Williams ok after spec inpc ok
BLD-Concrete9/8/20169/8/20169/12/2016PPEND
DetailsDave Hannah
Level 6 PT deck pour 2(north 1/2). Special Inspector has been on site for periodic inspections and is scheduled for today. Concrete scheduled for 12 am 9/8. SI is scheduled for concrete pour. Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete8/26/20168/26/20168/29/2016APART
DetailsDave Hannah
PT deck 6th floor pour 1(south 1/2). SI is scheduled and will be on site for pour. Concrete scheduled for 12 am 8/27 Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Conference8/18/20168/18/20168/19/2016PDEFR
DetailsMike Jordan
Stair tower 1 from level 5 to level 6. SI is scheduled for pour and is on site this morning. Concrete scheduled for 2:30 pm. SI will be present for pour. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete8/16/20168/16/20168/16/2016PDEFR
DetailsMike Jordan
Level 5 pour 2 (north 1/2) PT deck. SI has been on site and is scheduled for today. Structural Engineer is scheduled to visit this afternoon. Concrete is schedule for 12:00 am 8/17 SI is scheduled to attend pour. Phone #: ###-#### Inspection requested via web by Jim Williams. No time. Specail inspector on site.
BLD-Concrete8/9/20168/9/20168/9/2016APEND
DetailsDave Hannah
Level 5 pour 1 (south 1/2) PT deck. SI has been on site and is scheduled.
Concrete is scheduled for 12 am 8/10 Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Concrete8/5/20168/5/20168/5/2016PPEND
DetailsDave Hannah
Stair core 2 and elevator shaft walls levels 4-5. SI is onsite inspecting reinforcement placing. Concrete schedule for 8 am tomorrow morning. SI is scheduled. Our new office is across Capitol at 439 S Capitol.
Thanks Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Aging Inspection8/3/20168/3/20168/5/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection8/2/20168/2/20168/5/2016 PEND
DetailsDave Hannah
BLD-Concrete7/27/20167/27/20167/28/2016PPEND
DetailsDave Hannah
PT slab level 4 pour 2. SI on site. Structural Engineer reviewed 7/26. Concrete schedule for 12 am 7/28. SI scheduled for pour. Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Foundation3/17/20163/18/20163/21/2016APASS
DetailsDave Hannah
Ramp walls grid lines C.5 and D.5 6.5-8. SI scheduled. Concrete scheduled 2 pm.
Columns YZ grid(2), C.1 and F.4 SI scheduled. Concrete scheduled 10 am Saturday Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing3/14/20163/14/20163/15/2016PPEND
DetailsDave Hannah
Footing FS 42'' x 86'' Phone #: ###-#### Inspection requested via web by Jim Williams
BLD-Footing1/19/20161/20/20161/20/2016APEND
DetailsDave Hannah
Jim Phone #: ###-#### ok after spec inp sign off
BLD-Footing1/12/20161/13/20161/13/2016APART
DetailsDave Hannah
Jim Phone #: ###-####