BLD-Final | 2/11/2016 | 2/12/2016 | 2/12/2016 | A | FAIL |
Phil Shearer
|
|
|
Troy Phone #: ###-####. Open gas piping permit.
|
BLD-Final | 11/18/2015 | 11/19/2015 | 11/19/2015 | A | FAIL |
Jim Storey
|
|
|
Troy Phone #: ###-#### need drainage back of building/ open gas piping permit.
|
BLD-Framing/Rough-in | 10/12/2015 | 10/12/2015 | 10/12/2015 | P | PASS |
Phil Shearer
|
|
|
Troy Phone #: ###-####
|
BLD-Framing/Rough-in | 10/9/2015 | 10/9/2015 | 10/9/2015 | P | PART |
Phil Shearer
|
|
|
Troy Phone #: ###-#### Hold downs and truss bracing OK to insulate
|
BLD-Wall cover | 9/16/2015 | 9/17/2015 | 9/17/2015 | A | PASS |
Phil Shearer
|
|
|
Shear // Troy Phone #: ###-####
|
BLD-Wall Bracing | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | FAIL |
Phil Shearer
|
|
|
Troy Phone #: ###-####. No plans onsite
|
BLD-Foundation | 8/28/2015 | 8/31/2015 | 8/31/2015 | A | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 8/27/2015 | 8/28/2015 | 8/28/2015 | P | PASS |
Phil Shearer
|
|
|
Troy Phone #: ###-####
|