BLD-Final | 1/5/2016 | 1/5/2016 | 1/6/2016 | P | PASS |
Jim Sly
|
|
|
Jason-please call 30 minutes prior to meet Phone #: ###-####
|
DOC - Permit Finaled | 1/6/2016 | 1/6/2016 | 1/6/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 12/23/2015 | 12/28/2015 | 12/28/2015 | P | NR |
Jim Sly
|
|
|
Jason Phone #: ###-#### Contractor needs to get Mech. permit and inspection. After verifying Mech has finaled ......OK to final out permit. Need Cert of compliance..
|
FIRE-Final Inspection | 12/23/2015 | 12/28/2015 | 12/28/2015 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Conference | 12/17/2015 | 12/17/2015 | 12/17/2015 | P | DONE |
Jim Sly
|
|
|
Call half hour before // Jason Phone #: ###-####
|
FIRE-Final Inspection | 12/16/2015 | 12/17/2015 | 12/17/2015 | A | FAIL |
Troy Cobbley
|
|
|
As per the review comments a fire alarm permit is required for the work to be performed on the engineered drawings. Part of the work appears to have already been done. Life safety will be ok to sign off when this fire alarm work is completed/inspected.
|
BLD-Final | 12/16/2015 | 12/17/2015 | 12/17/2015 | P | CANC |
Jim Sly
|
|
|
Jason Phone #: ###-#### please call 45 minutes prior to meet
|
BLD-Framing/Rough-in | 10/7/2015 | 10/7/2015 | 10/7/2015 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Shawn Phone #: ###-####
|