Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-03000
StatusFinaled
Name RRC CONTRACTORS
Site Address 1602 N 28TH ST
Project Name28th Street Barre & Soul
Customer Number 
ePlanReviewYes
Description
**(28th STREET BARRE & SOUL)** Permit is to remodel an existing 1,550 sq. ft. building. Approval contingent upon adhering to the approved plans on file and attached engineering. Work to include: new construction of select interior non-bearing wall to create new break room, office/reception, changing room, studio back wall, and new ADA compliant restroom, new exterior door openings at lounge, new exterior wall infill at break room, lounge, studio back wall, restroom, new exterior window openings at break room, lounge, and restroom areas, adding new exterior awnings, new ADA van accessible parking (signed and marked), new electrical and lighting fixtures, new mechanical roof top unit and ductwork, new plumbing work, and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is not sprinklered. Note: special inspection required for post installed anchors **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/21/20161/22/20161/22/2016APASS
DetailsTony Young
Zach Phone #: ###-####
BLD-Final1/20/20161/21/20161/21/2016PPART
DetailsTony Young
Zach Phone #: ###-####,, needs ADA striping,, all else ok
FIRE-Final Inspection1/20/20161/21/20161/21/2016APASS
DetailsJim Page
No fire sprinklers, no fire alarms. Life fire safety inspection passed/complete
BLD-Conference1/20/20161/20/20161/20/2016PPASS
DetailsTony Young
Zack Phone #: ###-####,, ?s on final
FIRE-Conference1/20/20161/20/20161/20/2016PDONE
DetailsJim Page
Life fire safety conference complete
BLD-Energy code compliance12/10/201512/10/201512/10/2015PPASS
DetailsJim Sly
Zack Phone #: ###-####
BLD-Framing/Rough-in12/9/201512/10/201512/10/2015APART
DetailsJim Sly
Zach Phone #: ###-####
Wall Framing OK.....Told Zach that if he does not install Ext. door in break room.......AND omits Changing Room to have PDS approve as plan modification. Engineer is working on Roof trusses and framing additions or changes. (underside of roof will stay exposed). He is to call for insp when roof is completed. Any Engineering for roof structural changes shall be submitted to PDS for approval. (may be Strengthening trusses). Need special insp. report for insp of Epoxy bolting at new CMU openings. OK to insulate.