Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD15-03145
StatusFinaled
Name MARK GUHO CONSTRUCTION COMPANY
Site Address 1501 S FEDERAL WAY Unit: 200
Project NameEason Enterprises
Customer Number 
ePlanReviewYes
Description
(EASON ENTERPRISES)(VIEW POINT BUILDING)(2ND AND 3RD FLOOR) PLAN MODIFICATION FOR RESTOROOM CHANGES BASED ON ACTUAL MEASURMENTS ONCE CONSTRUCTION STARTED. see revised restroom layout. 11-4-15 **ajs**This 5 story building is NOT fire sprinklered. Permit to remodel the 2nd floor of the catholic diocese building to allow for a new call center tenant. The 3rd floor will be occupied by the same tenant but no work is being done on that floor under this permit. Work to include minor demolition as shown on approved plans. Scope of work to include nonbearing partition walls, restroom renovation and revised interior finish. See letter from Building Official in increased occupant load approval. **ajs**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/10/201512/15/201512/15/2015APASS
DetailsTony Young
Bill Phone #: ###-####,, ok for c of o
FIRE-Final Inspection12/11/201512/14/201512/14/2015PPASS
DetailsJim Page
Previously noted items addressed/repaired. No fire sprinklers, no fire alarm modifications. Life fire safety inspection passed/complete.
FIRE-Final Inspection12/10/201512/11/201512/11/2015PFAIL
DetailsJim Page
Exit signs/lights must be illimunated at all times under normal building power. Exit signs/lights also need to have an emergency power supply able to provide not less than 90 minutes of power. Emergency egress lighting needs to be installed on the second level, currently the only emergency lighting on the floor is in the restrooms.
BLD-Conference12/9/201512/9/201512/9/2015PPASS
DetailsJim Storey
Bill Phone #: ###-#### final ok pending other signoffs.
BLD-Framing/Rough-in12/9/201512/9/201512/9/2015PPASS
DetailsJim Storey
Bill Phone #: ###-####
BLD-Ceiling Grid Inspection11/24/201511/24/201511/24/2015PPASS
DetailsJim Storey
John Phone #: ###-####
BLD-Framing/Rough-in11/3/201511/4/201511/4/2015APART
DetailsJim Storey
Partial framing on conf rm, break rm & three offices - Bill Phone #: ###-#### ok to cover walls